Electronic Resource
[S.l.]
:
American Institute of Physics (AIP)
Review of Scientific Instruments
57 (1986), S. 726-726
ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
The Yale MP tandem accelerator was closed down on May 22, 1985, to begin the actual conversion process. The new accelerator pressure vessel (98 ft in length and 25 ft in diameter) was moved into the building on November 22, 1985. The new accelerator is projected to be operational at a terminal potential of 20 MV by October 1, 1986.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1138842
Permalink
|
Location |
Call Number |
Expected |
Availability |