ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    facet.materialart.
    Unknown
    Institute of Electrical and Electronics Engineers (IEEE)
    Publication Date: 2017-04-22
    Description: Testing is a critical activity in product development. The academic literature provides limited insight about overlapping between upstream testing and downstream design tasks, especially in considering the qualitative differences between activities that are overlapped. In general, the existing literature treats two overlapped sequential activities as similar, and suggests optimal overlapping policies, techniques, and time–cost assessment. However, this case study-based research identifies that the overlapping of upstream testing with downstream design activities has different characteristics than the overlapping of two design activities. This paper first analyzes the characteristics that affect the overlapping of upstream testing and downstream design activities, and then proposes a method to reduce the time of rework in cases where the upstream testing is overlapped with subsequent redesign phases.
    Print ISSN: 0018-9391
    Electronic ISSN: 1558-0040
    Topics: Technology
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...