Publication Date:
2016-06-07
Description:
The design, development, fabrication, testing, and transport of two 100 foot metal blades for the MOD-1 WTS are summarized. Because the metal blade design was started late in the MOD-1 system development, many of the design requirements (allocations) were restrictive for the metal blade concept, particularly the maximum weight requirement. The design solutions required to achieve the weight goal resulted in a labor intensive (expensive) fabrication, particularly for a quantity of only two blades manufactured using minimal tooling.
Keywords:
ENERGY PRODUCTION AND CONVERSION
Type:
NASA. Lewis Res. Center Large Wind Turbine Design Characteristics and R and D Requirements; p 325-342
Format:
application/pdf