ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
Collection
Keywords
Years
  • 1
    Publication Date: 2019-07-19
    Description: What is the risk? Given that astronauts exposed to microgravity experience a cephalad fluid shift, and that both symptomatic and asymptomatic astronauts have exhibited optic nerve sheath edema on MRI, there is a high probability that all astronauts have some degree of increased intracranial pressure (ICP; intracranial hypertension), and that those susceptible (via eye architecture, anatomy, narrow optic disc) have a high likelihood of developing papilledema (optic disc edema, globe flattening), choroidal folds, and/or hyperopic shifts and that the degree of edema may determine long-term or permanent vision impairment or loss. Back to back panels on this topic have been developed to address this emerging risk. The first panel will focus on the 6 clinical cases with emphasis on ophthalmic findings and imaging techniques used pre-, in-, and post-flight. The second panel will discuss the operational mitigation and medical requirements, the potential role of CO2 on ISS, and the research approach being developed. In total these back to back panels will explore what is known about this risk, what has been done immediately to address it, and how an integrated research model is being developed.
    Keywords: Aerospace Medicine
    Type: JSC-CN-21948 , 82nd Annual Scientific Meeting of the Aerospace Medical Association; May 08, 2011 - May 12, 2011; Anchorage, AK; United States
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Publication Date: 2019-07-19
    Description: Rehabilitating U.S. crew members to preflight status following flights on the Russian Mir Space Station required longer than six months for full functional recovery of some of the seven crew members. Additional exercise hardware has been added on the International Space Station as well as a rehabilitative emphasis on functional fitness/agility and proprioception. The authors will describe and present the results of the rehabilitation program for ISS and evaluate rehabilitative needs for longer missions. Pre- and in-flight programs emphasize strength and aerobic conditioning. One year before launch, crew members are assigned an Astronaut Strength and Conditioning specialist. Crew members are scheduled for 2 hours, 3 days a week, for pre-flight training and 2.5 hours, six days a week, for in-flight training. Crewmembers are tested on functional fitness, agility, isokinetic strength, and submaximal cycle ergometer evaluation before and after flight. The information from these tests is used for exercise prescriptions, comparison, and evaluation of the astronaut and training programs. The rehabilitation program lasts for 45 days and is scheduled for 2 hours during each crew workday. Phase 1 of the rehabilitation program starts on landing day and places emphasis on ambulation, flexibility, and muscle strengthening. Phase 2 adds proprioceptive exercise and cardiovascular conditioning. Phase 3 (the longest phase) focuses on functional development. All programs are tailored specifically for each individual according to their test results, preferred recreational activities, and mission roles and duties. Most crew members reached or exceeded their preflight test values 45 days after flight. Some crew members subjectively indicated the need for a longer rehabilitation period. The current rehabilitation program for returning ISS crew members seems adequate in content but may need to be extended for longer expeditions.
    Keywords: Aerospace Medicine
    Type: JSC-CN-7814 , AsMA 74th Annual Scientific Meeting; May 05, 2003 - May 09, 2003; San Antonio, TX; United States
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...