Publication Date:
2019-07-13
Description:
The purpose of this paper is to document the results of the pre-launch trajectory design and the real-time operations for the Microwave Anisotropy Probe (MAP) mission, launched on June 30, 2001. Once MAP was successfully inserted into a highly elliptical phasing orbit, three perigee maneuvers and a final perigee correction maneuver were performed to tailor a lunar encounter on July 30, 2001. MAP achieved its final Lissajous orbit (0.5 deg. by 10.5 deg.) about the Sun-Earth/Moon L2 libration point via this lunar encounter. This paper will show the maneuvers that were designed to arrive at the mission orbit. A further discussion of how the MAP trajectory analysts altered the pre-launch phasing loop maneuvers as well as the lunar encounter to meet all mission constraints, including the constraint of zero lunar shadows is also included.
Keywords:
Astronautics (General)
Type:
AIAA/AAS Astrodynamics Specialist Conference; Aug 05, 2002 - Aug 08, 2002; Monterey, CA; United States
Format:
application/pdf
Permalink