Publication Date:
2019-06-27
Description:
The quality control monitoring system, using accounting and quality control data bases, made it possible to perform an in-depth analysis. Results show that the percentage of useable data files for experimenter analysis was 97.7%; only 0.4% of the data sequences supplied to the experimenter exhibited missing data. The 50 percentile probability delay values (referenced to station record data) indicate that the analog tapes arrived within 11 days, the data were digitized within 4.2 weeks, and the experimenter tapes were delivered in 8.95 weeks or less.
Keywords:
SPACE SCIENCES
Type:
NASA-TM-X-65894
,
X-564-72-141
Format:
application/pdf
Permalink