ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Publication Date: 2005-01-20
    Keywords: unknown
    Type: NACA CONF. ON HIGH-SPEED AERODYN. 1958; P 543-564
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2011-08-16
    Description: On December 3, 1974, Pioneer 11 passed the planet Jupiter at a distance of 42,000 km. The spacecraft is now headed for an encounter with the planet Saturn in September 1979. The prime scientific objectives of the Pioneer 10 and Pioneer 11 missions are discussed along with the spacecraft payload, aspects of spacecraft design, the spacecraft power supply, and details regarding the spacecraft trajectory during the approach to Jupiter.
    Keywords: SPACECRAFT DESIGN, TESTING AND PERFORMANCE
    Type: Science; 188; May 2
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2011-08-17
    Description: Mission timetables, spacecraft, scientific objectives, and payloads of the two mission, Orbiter and Multiprobe, planned for launch and encounter with Venus during the 1978 Venus mission opportunity are described. Basically, the Orbiter mission has the goal of global mapping of the clouds, atmosphere and ionosphere of Venus by remote sensing and radio occultation, global studies by in situ measurements of the upper atmosphere and ionosphere and solar wind-ionosphere interaction region, and determination of gravitational field harmonics from perturbations of the spacecraft orbit. The Multiprobe mission will study the nature and composition of the clouds, the structure of the atmosphere, the circulation pattern, and the characteristics of the planetary environmental interaction with the solar wind.
    Keywords: LUNAR AND PLANETARY EXPLORATION
    Type: Space Science Reviews; 20; May 1977
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2011-08-16
    Description: The Pioneer missions to Jupiter are reviewed, and the observations made by the two probes are discussed. The spacecraft are described along with their launches, instrument packages, and trajectories. The major results of the micrometeorite, plasma, magnetic-field, and charged-particle experiments are summarized. The structure of Jupiter's magnetosphere is illustrated, spectroscopic and photometric observations by the Pioneers are discussed, and measurements of the Jovian atmosphere and gravitational field are examined. The measured masses and densities of the Galilean satellites are given, and future prospects for the Pioneer spacecraft are noted, including the possibility that Pioneer 10 may still be in contact with earth when it crosses the boundary between the solar system and interstellar space.
    Keywords: LUNAR AND PLANETARY EXPLORATION
    Type: Endeavour; 35; Jan. 197
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Publication Date: 2013-08-29
    Description: Solar probes
    Keywords: SPACE RADIATION
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 6
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2011-08-16
    Description: On Dec. 4, 1973, after 21 months in flight, Pioneer 10 passed by Jupiter at a distance within 130,000 km of its cloud tops. During the month before and after, instrumentation on the spacecraft made a number of scientific measurements of the Jupiter environment, thus completing one of three scientific objectives of the mission. Previously, Pioneer 10 had explored the asteroid belt and had completed the second scientific objective by determining that the belt did not present a hazard to spacecraft passing through it. The third objective, the exploration of interplanetary phenomena, started with the launch of Pioneer 10 and will not be completed until 1977 when the spacecraft nears the orbit of Uranus and the signal from the spacecraft becomes too weak to be heard at ground receivers.
    Keywords: SPACE VEHICLES
    Type: Science; 183; Jan. 25
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 7
    Publication Date: 2019-05-11
    Description: Feasibility of solar probes
    Keywords: STRUCTURAL MECHANICS
    Type: IAS PAPER-62-21
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 8
    Publication Date: 2019-06-27
    Description: Systems engineering aspects of developing Pioneer space probe
    Keywords: SPACE VEHICLES
    Type: NASA-TM-X-60564
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 9
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2019-07-13
    Description: The Pioneer 10 mission to Jupiter is described. Included are a discussion of the scientific objectives of the mission and a summary of the scientific findings related to the Asteroid Belt and Jupiter. The spacecraft and instruments are described and the effects of the Jupiter environment on their performance is discussed. The Pioneer 10 trajectory is described as well as the post-Jupiter trajectory for Pioneer 11.
    Keywords: LUNAR AND PLANETARY EXPLORATION
    Type: Technology today for tomorrow; Eleventh Space Congress; Apr 17, 1974 - Apr 19, 1974; Cocoa Beach, FL
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 10
    Publication Date: 2019-07-13
    Description: The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.
    Keywords: LUNAR AND PLANETARY EXPLORATION
    Type: NASA-TM-X-62481 , A-6255 , Intern. Astronautical Federation 26th Congr; Sep 21, 1975 - Sep 27, 1975; Lisbon; Portugal
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...