Publication Date:
2023
Description:
〈p〉〈em〉〈span〉Currently, wind and solar power generation systems have many drawbacks. Wind and solar power generation Full use of new energy will break the barrier to growth. Location for wind/solar hybrid power plant the primary problem is how to choose scientifically. This article selects six wind/solar hybrid power plants and implements them as a case study and evaluates these six areas via VIKOR by weighting the indicators through the MCDM method. Conclusions Related research findings and better valid, this demonstrates the feasibility and effectiveness of the method. This macro-site selection plants may provide some theoretical basis. In this statistical methods in the literature and established by statistical analysis. Tamil Nadu, Rajasthan, Maharashtra, Gujarat, Andhra Pradesh, Karnataka taken this alternative in this method and evaluation parameters are Total investment, Wind direction, Wind speed and speed change, sunshine stabilization, wind power density, energy saving, Environmental factors. Gujarat is on 2nd rank, Rajasthan is on the 1st rank, Tamil Nadu is on the 3rd rank, Indian Karnataka is on the 4th rank, Maharashtra is on the 5th rank and finally Andhra Pradesh is on the 6th rank.〈/span〉〈/em〉〈/p〉
Print ISSN:
2321-421X
Electronic ISSN:
2230-7990
Topics:
Geography
,
Geosciences
Permalink