ISSN:
1572-9338
Source:
Springer Online Journal Archives 1860-2000
Topics:
Mathematics
,
Economics
Notes:
Abstract The lot streaming model can sometimes be analyzed as a variation of the basic flow shop model. In this paper, we consider the lot streaming model with setup times, transfer lots of size one, and makespan objective. We show how to harness existing theory for time lags and setup times in the two-machine flow shop to analyze the lot streaming case. Extensions to more than two machines are also discussed.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1007/BF02099687
Permalink