ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    New York, NY [u.a.] : Wiley-Blackwell
    Process Safety Progress 15 (1996), S. 258-261 
    ISSN: 1066-8527
    Keywords: Chemistry ; Chemical Engineering
    Source: Wiley InterScience Backfile Collection 1832-2000
    Topics: Chemistry and Pharmacology , Process Engineering, Biotechnology, Nutrition Technology
    Notes: Process Safety Management (PSM) programs are expected to reduce the probability and severity of hazardous incidents. This paper presents a real life incident that occurred in a plan before a PSM program was put in place. A detailed description of the incident is provided with appropriate discussions of noncompliance with the PSM rule. Finally, the paper provides a theoretical scenario where a fully operational PSM program would have prevented the incident. The case history and discussion provided in this paper also reinforces the concept of maintaining process and equipment integrity through multiple barriers of safety. A fully operational PSM program represents such a multiple barrier safety systems.The incident occurred in a high temperature boiler in a process plant. The incident was caused by a sequence of four occurrences that combined to cause the boiler to lose water level and have serious internal and tube damage. The problem was not detected until a mechanic who was going to work on the feed pump realized that there was flames coming out of the boiler stack. The mechanic told the operator about the problem and the boiler was manually tripped. The boiler feedwater pump was not blocked in until 30 minutes after the incident was over. If this pump was started during or directly after the incident, the addition of boiler feedwater to the over-heated boiler would have caused an explosion. At the time the incident was reported there were 8-10 employees in the area of the boilers.
    Additional Material: 1 Ill.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...