Publication Date:
2018
Description:
〈h3〉Abstract〈/h3〉
〈p〉The authors solve the problem on forces required to change drilling path of air hammers in soil. Soil mass is assumed a rigid–plastic medium with the Mohr–Coulomb yield, and the air hammer deviator is considered as a nondeformable body. The problem is solved in two stages: introduction of the deviator in soil and travel of the air hammer in soil with the rear deviated at a certain angle. The loads applied to the rear, the forces and the moment required to changing the path of an air hammer in soil are calculated.〈/p〉
Print ISSN:
1062-7391
Electronic ISSN:
1573-8736
Topics:
Geosciences
,
Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics