ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Publication Date: 2019-08-14
    Description: On May 17, 2009, during the fourth EVA of SM4, astronauts Michael Good and Mike Massimino replaced the failed LVPS-2 circuit board on the Space Telescope Imaging Spectrograph (STIS), restoring this HST instrument to operation after a nearly 6 year hiatus. STIS after this 2009 repair operates in much the same way as it did during the 2001-2004 period of operations with the Side-2 electronics. Internal and external alignments of the instrument are similar to what they had been in 2004, and most changes in performance are modest. The STIS CCD detector continued to experience radiation damage during the hiatus in operations, leading to decreased charge transfer efficiency (CTE) and an increased number of hot pixels. The sensitivities for most modes are surprisingly close to what was expected from simple extrapolation of the 2003-2004 trends, although the echelle modes show somewhat more complex behavior. The biggest surprise was that the dark count rate for the NUV MAMA detector after SM4 has been much larger than had been expected; it is currently about 2.5 times bigger than it was in 2004 and is only slowly decreasing. We discuss how these changes will affect science with STIS now and in the future.
    Keywords: Optics
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...