ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2019-07-13
    Description: System function aspects of the first Space Shuttle mission are assessed. Almost 90 mission anomalies have been identified by a mission evaluation team, which were variously attributed to instrumentation sensor failures, improper operation, or design deficiencies. The two most significant problems encountered were Solid Rocket Booster ignition wave overpressure, which exceeded maximum expected pressure by a factor of 2:1 over most of the Orbiter and 5:1 at a sensor location on the aft bulkhead, near the engines, and an inoperative tumble valve, which would normally have imparted to the Space Shuttle External Tank a tumbling motion, after Tank separation, that insures disintegration of the large structure during reentry. The first problem has been solved by strengthening six support struts, and the second by ensuring that the tumble valve is moisture-free.
    Keywords: SPACE TRANSPORTATION
    Type: Annual Reliability and Maintainability Symposium; Jan 26, 1982 - Jan 28, 1982; Los Angeles, CA
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...