ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    IIE transactions 32 (2000), S. 93-103 
    ISSN: 1573-9724
    Source: Springer Online Journal Archives 1860-2000
    Topics: Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics
    Notes: Abstract The goal of this paper is to solve a continuous time production planning problem, where production rates are assumed to be piecewise constant. The problem is then to determine not only the rates, but also the times, called switching times, at which these rates may change. An iterative procedure is proposed where, at the first step, optimal rates are determined given the switching times and, at the second step, new switching times are added given the rates. A linear programming model is proposed and discussed for the first step. Several rules to remove or add switching times are also analyzed. Computational experiments are presented comparing two versions of the procedure and showing its efficiency.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...