Abstract Reservoir water release policies are computed for the Shiroro Dam hydroelectric power scheme in Northern Nigeria, using a probabilistic dynamic programming model. The state variable is the reservoir storage volume, while the uncertain nature of the inflow process is accounted for in the model by considering different possible inflow volumes and their inflow probabilities. Simulation of the reservoir operations with the derived policies show that on the average the hydrosystem has acceptable reliability when two units are in use, at 45% design power plant factor. At 70% power plant factor, which is the desired optimum for the power system in Nigeria, system failures are frequent and, in most cases, severe. For normal operation of the Shiroro Dam hydroelectric power system, two or three generating units, running at 40–50% power plant factor is recommended.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1007/BF00429902
Permalink