ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
  • Articles  (1,062)
  • Articles: DFG German National Licenses  (1,062)
  • Emerald  (1,061)
  • Blackwell Publishers Inc
  • Architecture, Civil Engineering, Surveying  (917)
  • Energy, Environment Protection, Nuclear Power Engineering  (145)
Collection
  • Articles  (1,062)
Source
Years
  • 1
    Electronic Resource
    Electronic Resource
    Boston, USA and Oxford, UK : Blackwell Publishers Inc
    Risk analysis 22 (2002), S. 0 
    ISSN: 1539-6924
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 374-381 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: Multiskilling refers to a labour utilization strategy in which workers learn multiple skills in one or more trades outside of their primary trade. Over 700 non-union craft workers across the USA were surveyed as part of a research effort. The data collected show that a slight increase in the breadth of skills positively impacts a worker's hourly wage, but only a weak relationship was found between multiskilling and more continuous employment.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 354-367 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: Requirements management (RM), as practised in the aerospace and defence sectors, attracts interest from construction researchers in response to longstanding problems of project definition. Doubts are expressed whether RM offers a new discipline for construction practitioners or whether it repeats previous exhortations to adopt a more disciplined way of working. Whilst systems engineering has an established track record of addressing complex technical problems, its extension to socially complex problems has been challenged. The dominant storyline of RM is one of procedural rationality and RM is commonly presented as a means of controlling dilettante behaviour. Interviews with RM practitioners suggest a considerable gulf between the dominant storyline in the literature and how practitioners operate in practice. The paper challenges construction researchers interested in RM to reflect more upon the theoretical debates that underpin current equivalent practices in construction and the disparity between espoused and enacted practice.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 391-401 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: This article discusses how information technology and human resource oriented management tools can be integrated using their respective strengths to enable knowledge production. Two companies' KM strategies encompassing a strong IT-component in combination with organisation, training and office design are analysed. Their experience shows that joining information technology with the human resource oriented tools is a necessary precondition for success in KM-efforts. Second, in the large company, there is still a relative overemphasis on "circumstantial" frames for knowledge production and too little focus on dynamics in knowledge producing processes. In contrast, the medium sized company is experimenting with soft tools used directly in the processes of the customer-oriented projects.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 382-390 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: In recent years, many organisations responsible for economic infrastructure have developed asset management systems to improve the financial and service performance of their facilities. Asset management is an integrated approach to improving the ability of an irrigation system to deliver water at a defined level of service in the most cost-effective manner. This paper describes how the analytic hierarchy process (AHP) is applied to identify priorities for asset renewals in the La Khe irrigation scheme in North Vietnam. The AHP methodology was coupled with the expected maximum utility (EMU) to evaluate renewal priorities of assets grouped by types and by location within the hydraulic system.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 6
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 402-412 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: There is a general sentiment against the idea of marketing among architectural professionals. This paper argues for the necessity of a marketing approach particularly in times where the workload is declining. This paper looks at the marketing strategies that the Western Cape architects follow. It examines their efforts in building a successful marketing portfolio that defines marketing targets, utilizes proper marketing tools, and carry on helpful image building tasks. The data were collected using a mailed questionnaire to all principals of architectural offices in the Western Cape Province. The concluding section relates these strategies with the perception of growth over a five-year period.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 7
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 413-417 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: This paper describes the application of rough set theory to equipment productivity estimate. Rough set theory offers a novel approach both in generation of rules and statistical classification of the equipment productivity data. The approach is based on upper and lower approximations of a set in terms of positive, negative and boundary regions. The information about the equipment productivity is organized in productivity information table. The table contains data about the object of interest characterized in terms of some attributes. The paper is more of an exploratory research to determine how rough set theory can be applicable to specific construction engineering problems.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 8
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 11 (2004), S. 9-19 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: Value management (VM) was introduced in China during 1978, when the reform and open door policy started. After a surge of VM applications that emerged in the late 1980s, the development of VM has declined sharply in the recent years in China. Although some successful applications of VM in China's construction industry have been observed, many actions should be taken to exert its full potential to improve value for money for clients. Aims to draw a holistic picture of the current VM practices and provide recommendations for its future development in China's construction industry. Provides a comparison between China's VM approach and the international mainstream to highlight the major differences.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 9
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 418-431 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: Procuring best value should be one of the key objectives in public sector construction projects. Best value depends upon sound "selection" strategies which ensure that the outlined project procurement objectives, including client/user demands are met. Examples of "best value" procurement are presented to demonstrate their usefulness and acceptance in principle. Further conceptualizations of various aspects of best value and the "dominance vectors" influencing the ultimate value definitions are developed, in accordance with basic public sector procurement principles. Presents a structured best value based contractor selection framework to optimize realizable value in public sector construction projects.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 10
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 11 (2004), S. 20-32 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: This paper presents the algorithm of construction work graphic schedule which considers the proper sequencing problem. Describes the algorithm step by step, i.e. the construction work organisation methods with zero couplings between realisation means, work fronts, and their combination. It also shows the calculation process of limit possible minimum by considering technical and organisation limits. In the second part of the paper, the practical example which shows the method and the optimisation algorithm for the work organisation method with zero couplings between realisation means is presented.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...