Abstract
Japan has traditionally performed flood prevention through the construction and use of dikes, storage reservoirs, and basins which are costly and time consuming options. Another non-structural option is to operate the flood control system appropriately with a view to reducing flood damage. In this paper, a flood control system combining the runoff prediction model in the whole river basin with the reservoir operation is discussed. Different models of the runoff process are introduced in order to compare their accuracies and the computational time for the flood forecasting system. The reservoir operational rule is formulated in terms of fuzzy inference theory. Historical data are applied in a case study for verification of the proposed theories.
Similar content being viewed by others
References
Ikebuchi, S.; Kojiri, T. 1981: Real-Time Operation of Reservoir Systems Including Flood, Low Flow and Turbidity Controls. Int, Symp. on Real-Time Operation of Hydrosystems. University of Waterloo. 71–87
Jazwinski, 1972: Stochastic Process and Filtering Theory. Academic Press 269–272
Hino, M.; Hasebe, M. 1982: Identification and Prediction of Nonlinear Hydrologic System (Hourly Unit Data). Proc. JSCE. No. 324, 83-94, in Japanese.
Kojiri, T.; Ikebuchi, S. 1988: Real-Time Operation of Dam Reservoir by Using Fuzzy Inference Theory. Proc. 6th Conference of APD-IAHR. Kyoto.
Kimura, T. 1962: The Storage Function Method (II). Technical Report in Civil Engineering 41–51 in Japanese
Niimura, H. 1986: Application of Regression Analysis by bold S S. Asakura Publishing Company. 1–74 in Japanese
Nishihara, I. 1976: Flood Forecasting. All Japan Association of Construction. 195–219 in Japanese
Sugano, M. 1986: Fuzzy Control. Proc. 2nd Fuzzy Symposium. in Japanese
Suzuki, E. 1973: Statistics in Meteorology. Modern Meteorology No. 3. Chijin-syokan Company. 145–156 in Japanese
Takasao, T.; Shiiba, M.; Takara, K. 1983: A Stochastic Method of Real-Time Flood Prediction in a Basin which Consists of Several Sub-basins. Annual Report of Disaster Prevention Research Institute No.26 B-2. Kyoto University, in Japanese
Takasao, T.; Shiiba, M.; Takara, K. 1985: Modeling of Real-Time Flood Forecast. Annual Report of Water Resources Research Center. No. 5. Kyoto University. 19–31 in Japanese
The Ministry of Construction. 1985: Flood Prediction in the Kiso River-1985. Annual Report. in Japanese
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Kojiri, T., Ikebuchi, S. & Yamada, H. Basinwide flood control system by combining prediction and reservoir operation. Stochastic Hydrol Hydraul 3, 31–49 (1989). https://doi.org/10.1007/BF01543426
Accepted:
Issue Date:
DOI: https://doi.org/10.1007/BF01543426