Upgrading hydropower plants with storage: timing and capacity choice

  • Original Paper
  • Published:
Energy Systems Aims and scope Submit manuscript

Abstract

This paper presents an investment decision support framework for a hydropower producer with storage facilities that is considering upgrading the production capacity in its power plant. A real options framework is proposed to support the investment decision, where both investment timing and capacity choice are considered. Using a case from a Norwegian hydropower producer, we employ the framework to evaluate investment opportunities in this company. Our main contribution is an approach that combines hydropower scheduling and real options valuation for already constructed power plants. Furthermore, the results from our case analysis suggest feasible investment strategies for the hydropower producer.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3

Similar content being viewed by others

Notes

  1. Their approach is developed for option pricing purposes.

  2. Due to restrictions from the case provider, some technical parameters are not presented.

  3. In the production scheduling, we find the present value of the annual revenue for each investment alternative for a range of annual price levels.

  4. The daily long term mean reversion factor, \(\eta \), corresponds to the annual long term mean reversion factor, \(\lambda \), in Eq. (7).

  5. We use spot price data from Nord Pool from the period 01.01.2005 to 31.12.2008.

  6. Specifically, we use contracts with a delivery period of 1 year, and 3 years to maturity. The data is taken from the period 01.01.2008 to 31.12.2008.

  7. This approximately equals the historical median reservoir level.

  8. The valuation procedure is developed for option pricing.

  9. Note that this is the same discount factor as used in the production planning.

References

  1. Bøckman, T., Fleten, S.-E., Juliussen, E., Langhammer, H., Revdal, I.: Investment timing and optimal capacity choice for small hydropower projects. Eur. J. Oper. Res. 190(1), 255–267 (2008)

    Article  Google Scholar 

  2. Dangl, T., Wirl, F.: Investment under uncertainty: calculating the value function when the Bellman equation cannot be solved analytically. J. Econ. Dyn. Control 28(7), 1437–1460 (2004)

    Article  MATH  MathSciNet  Google Scholar 

  3. Décamps, J., Mariotti, T., Villeneuve, S.: Irreversible investment in alternative projects. Econ. Theory 28(2), 425–448 (2006)

    Article  MATH  Google Scholar 

  4. Dixit, A.K., Pindyck, R.S.: Investment under uncertainty. Princeton University Press, Princeton (1994)

    Google Scholar 

  5. EIA: Energy Information Administration, International Energy Outlook (IEO2009). http://www.eia.doe.gov/ (2009). Accessed 14 March 2009

  6. European Commission: Directive 2009/29/EC of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources and amending and subsequently repealing directives 2001/77/EC and 2003/30/EC (2008)

  7. European Commission: Renewable energy, targets by 2020 (2011). http://ec.europa.eu/energy/renewables/targets_en.htm. Accessed 2 Nov 2011

  8. Fleten, S.-E., Heggedal, A.M., Siddiqui, A.: Transmission capacity between Norway and Germany: a real options analysis. J. Energy Mark. 4(1), 121–147 (2011)

    Google Scholar 

  9. Fleten, S.-E., Wallace, S.W., Ziemba, W.T.: Hedging electricity portfolios using stochastic programming. In: Greengard, C., Ruszczyński, A. (eds.) Decision making under uncertainty: energy and power, IMA volumes on mathematics and its applications, vol. 128, pp. 71–93. Springer, New York (2002)

    Chapter  Google Scholar 

  10. Fosso, O.B., Gjelsvik, A., Haugstad, A., Mo, B., Wangensteen, I.: Generation scheduling in a deregulated system. The Norwegian case. IEEE Trans. Power Syst. 14(1), 75–81 (1999)

    Article  Google Scholar 

  11. Fuss, S., Szolgayova, J., Obersteiner, M., Gusti, M.: Investment under market and climate policy uncertainty. Appl. Energy 85(8), 708–721 (2008)

    Article  Google Scholar 

  12. Gjelsvik, A., Mo, B., Haugstad, A.: Handbook of power systems I, energy systems. In: Rebennack, S., Pardalos, P., Pereira, M., Iliadis, N. (eds.) Long- and medium term operations planning and stochastic modelling in hydro-dominated power systems based on stochastic dual dynamic programming, pp. 33–55. Springer, New York (2010)

    Google Scholar 

  13. Johnsen, T.A., Verma, S.K., Wolfram, C.D.: Zonal pricing and demand-side bidding in the Norwegian electricity market. University of California Energy Institute, POWER Working Paper-063 (1999)

  14. Keppo, J., Näsäkkälä, E.: Hydropower with financial information. Appl. Math. Finance 15(5), 1–27 (2008)

    MathSciNet  Google Scholar 

  15. Kjærland, F.: A real option analysis of investment in hydropower: the case of Norway. Energy Policy 35(11), 5901–5908 (2007)

    Article  Google Scholar 

  16. Lucia, J.J., Schwartz, E.S.: Electricity prices and power derivatives: evidence from the Nordic power exchange. Rev. Deriv. Res. 5(1), 5–50 (2002)

    Article  MATH  Google Scholar 

  17. McDonald, R., Siegel, D.: The value of waiting to invest. Q. J. Econ. 101(4), 707–727 (1986)

    Article  Google Scholar 

  18. NVE: Økt installasjon i eksisterende vannkraftverk, [Increased installed capacity in existing hydropower plants)]. Tech. Rep. 10, Norwegian Water Resources and Energy Directorate (2011)

  19. Statnett: Konsesjonssøknad, liketrømsforbindelse, Norge - Tyskland, [Application for license, direct current transmission line, Norway - Germany]. Tech. Rep. 200906370, Norwegian Water Resources and Energy Directorate (2010)

  20. Statnett: NorNed (2011). http://www.statnett.no/en/Projects/NorNed/. Accessed 18 Nov 2011

  21. Statnett: Skagerak 4 (2011). http://www.statnett.no/no/Prosjekter/Skagerrak-4/. Accessed 18 Nov 2011

  22. Wallace, S.W., Fleten, S.-E.: Stochastic programming, handbooks in operations research and management science. In: Ruszczynski, A., Shapiro, A. (eds.) Stochastic programming models in energy, pp. 637–677. Elsevier, London (2003)

    Chapter  Google Scholar 

  23. Yeh, W.: Reservoir management and operations models: a state-of-the-art review. Water Resour. Res. 21(12), 1797–1818 (1985)

    Article  Google Scholar 

  24. Zhao, G., Davison, M.: Valuing hydrological forecasts for a pumped storage assisted hydro facility. J. Hydrol. 373(3–4), 453–462 (2009)

    Article  Google Scholar 

Download references

Acknowledgments

The case study was provided by Norsk Hydro ASA, and the authors are thankful for the contributions of data and feedback from Norsk Hydro ASA. The authors acknowledge support from the FINERGY Project 178374 at NTNU and input from anonymous reviewers. This work has partly been carried out as a part of the Young Scientist Summer program (YSSP) at the International Institute for Applied Systems Analysis (IIASA).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ane Marte Andersson.

Appendices

Appendices

Appendix 1

Parameters for valuation framework See Tables 6, 7, 8

Table 6 Estimated parameters for the daily electricity price dynamics presented in Eqs. (1)–(4)
Table 7 Parameters and sets for numerical example
Table 8 Estimated parameters for the autoregressive process presented in Eq (7)

Appendix 2

figure a

Rights and permissions

Reprints and permissions

About this article

Cite this article

Andersson, A.M., Elverhøi, M., Fleten, SE. et al. Upgrading hydropower plants with storage: timing and capacity choice. Energy Syst 5, 233–252 (2014). https://doi.org/10.1007/s12667-013-0112-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12667-013-0112-2

Keywords

Navigation