ExLibris header image
SFX Logo
Title: Using DNPV for valuing investments in the energy sector: A solar project case study
Source:

Renewable Energy [0960-1481] Espinoza, R D yr:2015


Collapse list of basic services Basic
Sorry, no full text available...
Please use the document delivery service (see below)  
Holding information
Holdings in library search engine ALBERT GO
Document delivery
Request document via Library/Bibliothek GO
Users interested in this article also expressed an interest in the following:
1. Espinoza, D. "Decoupled NPV: a simple, improved method to value infrastructure investments." Construction Management and Economics 31.5 (2013): 471-496. Link to SFX for this item
2. Ye, S. "NPV-at-risk method in infrastructure project investment evaluation." Journal of construction engineering and management 126.3 (2000): 227-233. Link to SFX for this item
3. Oudalov, A. "Sizing and Optimal Operation of Battery Energy Storage System for Peak Shaving Application." 2007 IEEE Lausanne Power Tech 2007. 621-625. Link to Full Text for this item Link to SFX for this item
4. Davies, R. "Implementing 'Site BIM': A case study of ICT innovation on a large hospital project.(Case study)." Automation in construction 30 (2013): 15-. Link to SFX for this item
5. Liu, P. "A risk evaluation method for the high-tech project investment based on uncertain linguistic variables." Technological forecasting & social change 78.1 (2011): 40-50. Link to SFX for this item
6. Espinoza, R. David D. "Separating project risk from the time value of money: A step toward integration of risk management and valuation of infrastructure investments." International journal of project management 32.6 (2013): 1056-1072. Link to SFX for this item
7. Garvin, M. "Valuation techniques for infrastructure investment decisions." Construction management and economics 22.4 (2004): 373-383. Link to SFX for this item
8. Walker, Derek H. "An investigation into construction time performance." Construction management and economics 13.3 (1995): 263-274. Link to Full Text for this item Link to SFX for this item
9. Akintoye, A. "Achieving best value in private finance initiative project procurement." Construction Management and Economics 21.5 (2003): 461-470. Link to SFX for this item
10. Gollier, C. "Time Horizon and the Discount Rate." Journal of economic theory 107.2 (2002): 463-473. Link to Full Text for this item Link to SFX for this item
11. Brookfield, D. "Risk and capital budgeting: avoiding the pitfalls in using NPV when risk arises." Management decision 33.8 (1995): 56-59. Link to SFX for this item
12. Klessmann, C. "Pros and cons of exposing renewables to electricity market risks--A comparison of the market integration approaches in Germany, Spain, and the UK." Energy policy 36.10 (2008): 3646-3661. Link to SFX for this item
13. Ranasinghe, M. "Private sector participation in infrastructure projects: A methodology to analyze viability of BOT." Construction Management and Economics 17.5 (1999): 613-623. Link to Full Text for this item Link to SFX for this item
14. Gardiner, Paul D. "Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure." International journal of project management 18.4 (2000): 251-256. Link to Full Text for this item Link to SFX for this item
15. Chao, C. "Optimal Sizing and Control of Battery Energy Storage System for Peak Load Shaving." Energies 7.12 (2014): 8396-410. Link to SFX for this item
16. Mahjoob, M. "Optimal energy management in a dual-storage fuel-cell hybrid vehicle using multi-dimensional dynamic programming." Journal of power sources 250 (2014): 359-371. Link to SFX for this item
17. Ostadi, A. "Optimal sizing of the Energy Storage System (ESS) in a Battery-Electric Vehicle." 2013 IEEE Transportation Electrification Conference and Expo (ITEC) 2013. 1-6. Link to Full Text for this item Link to SFX for this item
18. Soong, T. "Optimal operation strategy and sizing of battery energy storage systems." 2012 25th IEEE Canadian Conference on Electrical and Computer Engineering (CCECE) 2012. 1-4. Link to Full Text for this item Link to SFX for this item
19. Zhang, J. "Coordination of Information Sharing in A Supply Chain." International journal of production economics 143.1: 178-187. Link to SFX for this item
20. Davies, R. "Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project." Automation in construction 30.145 (2012): 15-24. Link to SFX for this item
View More...
View Less...
Select All Clear All

Expand list of advanced services Advanced