ExLibris header image
SFX Logo
Title: Critical-path scheduling of mental processes in a dual task
Source:

Science [0036-8075] Schweickert, R yr:1980


Collapse list of basic services Basic
Sorry, no full text available...
Please use the document delivery service (see below)  
Holding information
Holdings in library search engine ALBERT GO
Document delivery
Request document via Library/Bibliothek GO
Users interested in this article also expressed an interest in the following:
1. Whelan, R. "Effective analysis of reaction time data." The Psychological record 58.3 (2008): 475-482. Link to SFX for this item
2. WILLIS, RJ J. "CRITICAL PATH-ANALYSIS AND RESOURCE CONSTRAINED PROJECT SCHEDULING - THEORY AND PRACTICE." European journal of operational research 21.2 (1985): 149-155. Link to Full Text for this item Link to SFX for this item
3. Rao, Phani B. "Fuzzy Critical Path Method Based on Lexicographic Ordering." Pakistan journal of statistics and operation research 8.1 (2012): 139-154. Link to SFX for this item
4. Soroush, H.M. M. "The most critical path in a PERT network: A heuristic approach." European journal of operational research 78.1 (1994): 93-105. Link to Full Text for this item Link to SFX for this item
5. Trommershauser, J. "Statistical decision theory and the selection of rapid, goal-directed movements." Journal of the Optical Society of America. A, Optics, image science, and vision 20.7 (2003): 1419-33. Link to SFX for this item
6. Posner, M. "Timing the brain: Mental chronometry as a tool in neuroscience." PLoS biology 3.2 (2005): -206. Link to Full Text for this item Link to SFX for this item
7. Hasbroucq, T. "An additive factor analysis of the effect of depression on the reaction time of old patients." Acta psychologica 117.1 (2004): 1-11. Link to SFX for this item
8. Monahan, J. "Better DECISIONS through SCIENCE." Scientific American 283.4: 82-7. Link to SFX for this item
9. Menon, Ravi S. "Spatial and temporal limits in cognitive neuroimaging with fMRI." Trends in cognitive sciences 3.6 (1999): 207-216. Link to SFX for this item
10. Lusher, J. "Alcohol dependence and the alcohol Stroop paradigm: evidence and issues." Drug and Alcohol Dependence 75.3 (2004): 225-31. Link to SFX for this item
11. Ahmed, A. "A review of techniques for risk management in projects." Benchmarking 14.1 (2007): 22-36. Link to SFX for this item
12. Atin, S. "Implementation of Critical Path Method in Project Planning and Scheduling." IOP conference series. Materials science and engineering 662.2 (2019): 22031-. Link to Full Text for this item Link to SFX for this item
13. Schonberger, Richard J. "Why projects are “always” late: A rationale based on manual simulation of a PERT/CPM network." Interfaces 11.5 (1981): 66-70. Link to Full Text for this item Link to SFX for this item
14. Pour, N S. "A new method for critical path method with fuzzy processing time." Management science letters 1.3 (2011): 347-354. Link to SFX for this item
15. Chen, S. "Analysis of critical paths in a project network with fuzzy activity times." European journal of operational research 183.1 (2007): 442-459. Link to SFX for this item
16. Kallo, G. "Reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims." Cost engineering 38.5 (1996): 35-37. Link to SFX for this item
17. ELSAYED, EA. "ALGORITHMS FOR PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS." International journal of production research 20.1 (1982): 95-103. Link to Full Text for this item Link to SFX for this item
18. Johnson, K. "The Critical Path method." Senior market advisor 13.6 (2012): 56-. Link to SFX for this item
19. De Rugy, A. "Muscle coordination is habitual rather than optimal." The Journal of neuroscience 32.21 (2012): 7384-7391. Link to Full Text for this item Link to SFX for this item
20. Weiner, S C. "Using hydrogen safety best practices and learning from safety events." International journal of hydrogen energy 36.3 (2011): 2729-2735. Link to SFX for this item
View More...
View Less...
Select All Clear All

Expand list of advanced services Advanced