Abstract
We are performing experiments with a 92-kV, 810-kA, 74.6-GW linear transformer driver (LTD) cavity. This cavity generates a power pulse from DC-charged capacitors in a single step. Our experiments start with an existing 100-kV, 490-kA LTD cavity and are making a number of improvements to it that are aimed at increasing the cavity’s peak output power and better understanding its operation. We are making improvements to the gas switches, the capacitors, and the magnetic toroids as well as heavily instrumenting the cavity. These experiments have increased the cavity’s output current into a matched load by 65% without increasing its volume.
5 More- Received 27 January 2011
- Publisher error corrected 19 April 2011
DOI:https://doi.org/10.1103/PhysRevSTAB.14.040401
This article is available under the terms of the Creative Commons Attribution 3.0 License. Further distribution of this work must maintain attribution to the author(s) and the published article’s title, journal citation, and DOI.
© 2011 American Physical Society
Corrections
19 April 2011