Paper The following article is Open access

Hydraulic analysis and optimization design in Guri rehabilitation project

, , , , , and

Published under licence by IOP Publishing Ltd
, , Citation H Cheng et al 2016 IOP Conf. Ser.: Earth Environ. Sci. 49 102004 DOI 10.1088/1755-1315/49/10/102004

1755-1315/49/10/102004

Abstract

Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1755-1315/49/10/102004