NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Life science payloads planning study integration facility survey resultsThe integration facility survey effort described is structured to examine the facility resources needed to conduct life science payload (LSP) integration checkout activities at NASA-JSC. The LSP integration facility operations and functions are defined along with the LSP requirements for facility design. A description of available JSC life science facilities is presented and a comparison of accommodations versus requirements is reported.
Document ID
19800004809
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Wells, G. W.
(McDonnell-Douglas Astronautics Co. Huntington Beach, CA, United States)
Brown, N. E.
(McDonnell-Douglas Astronautics Co. Huntington Beach, CA, United States)
Nelson, W. G.
(McDonnell-Douglas Astronautics Co. Huntington Beach, CA, United States)
Date Acquired
September 4, 2013
Publication Date
November 1, 1976
Subject Category
Astronautics (General)
Report/Patent Number
MDC-G6275
NASA-CR-160390
Accession Number
80N13064
Funding Number(s)
CONTRACT_GRANT: NAS9-14589
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available