The following article is Open access

Status of the ACCULINNA-2 project at FLNR

, , , , , , , , , , , , , , , , , , , , , , , , , , , and

Published under licence by IOP Publishing Ltd
, , Citation A S Fomichev et al 2012 J. Phys.: Conf. Ser. 337 012025 DOI 10.1088/1742-6596/337/1/012025

1742-6596/337/1/012025

Abstract

The project of a new and more powerful in-flight fragment separator ACCULINNA-2 at U-400M cyclotron in FLNR, JINR planned to build in addition to the existing separator ACCULINNA is presented. The new separator will provide high intensity RIBs in the lowest energy range (5÷50 MeV/nucleon) which is attainable for in-flight separators. The possibilities for the astrophysics studies at the proposed device are presented. ACCULINNA–2 separator is planned to be constructed in the years 2010-2015. The current status of the project is reported.

Export citation and abstract BibTeX RIS

Please wait… references are loading.
10.1088/1742-6596/337/1/012025