NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Development of the Electron Drift Instrument (EDI) for ClusterThe Electron Drift Instrument (EDI) is a new technique for measuring electric fields in space by detecting the effect on weak beams of test electrons. This U.S. portions of the technique, flight hardware, and flight software were developed for the Cluster mission under this contract. Dr. Goetz Paschmann of the Max Planck Institute in Garching, Germany, was the Principle Investigator for Cluster EDI. Hardware for Cluster was developed in the U.S. at the University of New Hampshire, Lockheed Palo Alto Research Laboratory, and University of California, San Diego. The Cluster satellites carrying the original EDI instruments were lost in the catastrophic launch failure of first flight of the Arianne-V rocket in 1996. Following that loss, NASA and ESA approved a rebuild of the Cluster mission, for which all four satellites were successfully launched in the Summer of 2000. Limited operations of EDI were also obtained on the Equator-S satellite, which was launched in December, 1997. A satellite failure caused a loss of the Equator-S mission after only 5 months, but these operations were extremely valuable in learning about the characteristics and operations of the complex EDI instrument. The Cluster mission, satellites, and instruments underwent an extensive on-orbit commissioning phase in the Fall of 2000, carrying over through January 2001. During this period all elements of the instruments were checked and careful measurements of inter-experiments interferences were made. EDI is currently working exceptionally well in orbit. Initial results verify that all aspects of the instrument are working as planned, and returning highly valuable scientific information. The first two papers describing EDI on-orbit results have been submitted for publication in April, 2001. The principles of the EDI technique, and its implementation on Cluster are described in two papers by Paschmann et al., attached as Appendices A and B. The EDI presentation at the formal Cluster Commissioning Review, held at ESA Headquarters in Paris, is attached as Appendix C.
Document ID
20020013843
Acquisition Source
Goddard Space Flight Center
Document Type
Other
Authors
Quinn, Jack
(New Hampshire Univ. Durham, NH United States)
Christensen, John L.
Date Acquired
September 7, 2013
Publication Date
April 13, 2001
Subject Category
Spacecraft Instrumentation And Astrionics
Funding Number(s)
CONTRACT_GRANT: NAS5-30744
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available