NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Multistage Simulations of the GE90 TurbineThe average passage approach has been used to analyze three multistage configurations of the GE90 turbine. These are a high pressure turbine rig, a low pressure turbine rig and a full turbine configuration comprising 18 blade rows of the GE90 engine at takeoff conditions. Cooling flows in the high pressure turbine have been simulated using source terms. This is the first time a dual-spool cooled turbine has been analyzed in 3D using a multistage approach. There is good agreement between the simulations and experimental results. Multistage and component interaction effects are also presented. The parallel efficiency of the code is excellent at 87.3% using 121 processors on an SGI Origin for the 18 blade row configuration. The accuracy and efficiency of the calculation now allow it to be effectively used in a design environment so that multistage effects can be accounted for in turbine design.
Document ID
19990095795
Acquisition Source
Glenn Research Center
Document Type
Contractor Report (CR)
Authors
Turner, Mark G.
(General Electric Co. Cincinnati, OH United States)
Vitt, Paul H.
(ASE Technologies, Inc. Cincinnati, OH United States)
Topp, David A.
(General Electric Co. Cincinnati, OH United States)
Saeidi, Sohrab
(General Electric Co. Cincinnati, OH United States)
Hunter, Scott D.
(General Electric Co. Cincinnati, OH United States)
Dailey, Lyle D.
(General Electric Co. Cincinnati, OH United States)
Beach, Timothy A.
(DYNACS Engineering Co., Inc. Brook Park, OH United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1999
Subject Category
Aircraft Propulsion And Power
Report/Patent Number
E-11880
NAS 1.26:209311
NASA/CR-1999-209311
Meeting Information
Meeting: Gas Turbine and Aeroengine Congress
Location: Indianapolis, IN
Country: United States
Start Date: June 7, 1999
End Date: June 10, 1999
Sponsors: International Gas Turbine Inst., American Society of Mechanical Engineers
Funding Number(s)
CONTRACT_GRANT: NAS3-26617
PROJECT: RTOP 509-10-11
CONTRACT_GRANT: NAS3-27720
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available