Skip to main content
Log in

Optimization of monitoring well installation time and location during aquifer decontamination

  • Published:
Water Resources Management Aims and scope Submit manuscript

Abstract

An important question in the systematic and objective design of general-purpose ground-water quality monitoring networks is how to evaluate quantitatively the information they provide. However, many applications require the design of a groundwater monitoring network in conjunction with remedial action at a subsurface contamination site. In such a case, it is conceptually clear what is a successful network: One that reduces the net cost of meeting the objectives of cleanup. Uncertainty entails a cost because the natural management response to uncertainty is overdesign for the sake of conservatism (‘safety factor’). The additional information that the network provides must lead to cost reductions that outweigh its cost. This paper presents a method to determine the installation time and location of an additional monitoring well while the aquifer is being cleaned up. While rates of pumping and treatment are determined by the dual control method (a method for optimization with incomplete information) candidate well locations are ranked according to a ‘cost-to-go’ index that measures the costs expected until the goals of remediation are met. This index accounts for the cost associated with uncertainty about the system and thus is useful in appraising the value of information from new measurements in the context of the specific cleanup effort. The usefulness of the method is illustrated through application to a hypothetical two-dimensional aquifer with uncertain initial estimates of the system parameters and variables. Monte Carlo simulations demonstrate the cost effectiveness of solution obtained through this method.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Anderson, B. D. O. and Moore, J. B.: 1979, Optimal Filtering, Prentice-Hall, New York.

    Google Scholar 

  • Andricevic, R., and Kitanidis, P. K.: 1990, Optimization of the pumping schedule in aquifer remediaton under uncertainty, Water Resour. Res. 26(5): 875–885.

    Google Scholar 

  • Department of Energy: 1988, Site-directed subsurface environmental initiative: Five-year summary and plan for fundamental research in subsoils and groundwater, DOE/ER-03344/1, Washington, D.C.

  • EPA: 1988, Guidance on remedial actions for contaminated ground water at Superfund sites, EPA/540/G-88/003.

  • Graham, W. and McLaughlin, D.: 1989a, Stochastic analysis of nonstationary subsurface solute transport, 1. Unconditional moments, Water Resour. Res. 25(2), 215–232.

    Google Scholar 

  • Graham, W. and McLaughlin, D.: 1989b, Stochastic analysis of nonstationary subsurface solute transport, 2. Conditional moments, Water Resour. Res. 25(11), 2311–2356.

    Google Scholar 

  • Hsueh, Y. W. and Rajagopal, R: 1988, Modeling groundwater quality sampling decisions, Ground Water Monitor. Rev., 121–134.

  • Knopman, D. S. and Voss, C. I.: 1989, Multiobjective sampling design for parameter estimation and model discrimination in groundwater solute transport, Water Resour. Res. 25(10): 2245–2258.

    Google Scholar 

  • Lee, S.-I. and Kitanidis, P. K.: 1991, Optimal estimation and scheduling in aquifer remediation with incomplete information, Water Resour. Res. 27(9): 2203–2217.

    Google Scholar 

  • Loaiciga, H. A.: 1988, Groundwater monitoring network design, in: M. A. Celia, L. A. Ferrand, C. A. Brebia, N. G. Gray, and G. F. Pinder (eds.), Proc. VII Intl. Conf. Computational Methods in Water Resources, Computational Mechanics Publications/Elsevier, New York, vol 2, pp. 371–376.

    Google Scholar 

  • Loaiciga, H. A.: 1989, An optimization approach for groundwater quality monitoring network design, Water Resour. Res., 25(8): 1771–1782.

    Google Scholar 

  • Loaciga, H. A., Charbeneau, R. J., Everette, L. G., Fogg, G. E., Hobbs, B. F. and Rouhani, S.: 1992, Review of ground water quality monitoring network design, J. Hydraulic Engineering 118(1), 11–37, 1992.

    Google Scholar 

  • Massmann, J. and Freeze, R. A.: 1987a, Groundwater contamination from waste management site: The interaction between risk-based engineering design and regulatory policy, 1, Methodology. Water Resour. Res. 23(2), 351–367.

    Google Scholar 

  • Massmann, J. and Freeze, R. A.: 1987b, Groundwater contamination from waste management site: The interaction between risk-based engineering design and regulatory policy, 2, Results, Water Resour. Res. 23(2), 368–380.

    Google Scholar 

  • McKinney, D. C. and Loucks, D. P.: 1992, Network design for predicting groundwater contamination, Water Resour. Res. 28(1), 133–147, 1992.

    Google Scholar 

  • Mehra, R. K.: 1970, On the identification of variances and adaptive Kalman Filtering, IEEE Trans. Autom. Contr. AC 15(2), 175–184.

    Google Scholar 

  • Meyer, P. D. and Brill, E. D. Jr.: 1988, A method for locating wells in a groundwater monitoring network under conditions for uncertainty, Water Resour. Res. 24(8), 1277–1282.

    Google Scholar 

  • Rouhani, S.: 1985, Variance reduction analysis, Water Resour. Res. 21(6), 837–846.

    Google Scholar 

  • Rouhani, S. and Hall, T. J.: 1988, Geostatistical schemes for groundwater sampling, J. Hydrology 103, 85–102.

    Google Scholar 

  • Schlee, F. H., Standish, C. J. and Toda, F.: 1967, Divergence in the Kalman filter, AIAA J., 5, pp. 1114–1120.

    Google Scholar 

  • Tucciarelli, T. and Pinder, G.: 1991, Optimal data acquisition strategy for the development of a transport model for groundwater remediation, Water Resour. Res. 27(4), 577–588, 1991.

    Google Scholar 

  • Woldt, W. and Bogardi, I.: 1992, Ground water monitoring network design using multiple criteria decision making and geostatistics, Water Resour. Bull. 28(1), 45–62.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lee, SI., Kitanidis, P.K. Optimization of monitoring well installation time and location during aquifer decontamination. Water Resour Manage 10, 439–462 (1996). https://doi.org/10.1007/BF00422549

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00422549

Key words

Navigation