Abstract
An important question in the systematic and objective design of general-purpose ground-water quality monitoring networks is how to evaluate quantitatively the information they provide. However, many applications require the design of a groundwater monitoring network in conjunction with remedial action at a subsurface contamination site. In such a case, it is conceptually clear what is a successful network: One that reduces the net cost of meeting the objectives of cleanup. Uncertainty entails a cost because the natural management response to uncertainty is overdesign for the sake of conservatism (‘safety factor’). The additional information that the network provides must lead to cost reductions that outweigh its cost. This paper presents a method to determine the installation time and location of an additional monitoring well while the aquifer is being cleaned up. While rates of pumping and treatment are determined by the dual control method (a method for optimization with incomplete information) candidate well locations are ranked according to a ‘cost-to-go’ index that measures the costs expected until the goals of remediation are met. This index accounts for the cost associated with uncertainty about the system and thus is useful in appraising the value of information from new measurements in the context of the specific cleanup effort. The usefulness of the method is illustrated through application to a hypothetical two-dimensional aquifer with uncertain initial estimates of the system parameters and variables. Monte Carlo simulations demonstrate the cost effectiveness of solution obtained through this method.
Similar content being viewed by others
References
Anderson, B. D. O. and Moore, J. B.: 1979, Optimal Filtering, Prentice-Hall, New York.
Andricevic, R., and Kitanidis, P. K.: 1990, Optimization of the pumping schedule in aquifer remediaton under uncertainty, Water Resour. Res. 26(5): 875–885.
Department of Energy: 1988, Site-directed subsurface environmental initiative: Five-year summary and plan for fundamental research in subsoils and groundwater, DOE/ER-03344/1, Washington, D.C.
EPA: 1988, Guidance on remedial actions for contaminated ground water at Superfund sites, EPA/540/G-88/003.
Graham, W. and McLaughlin, D.: 1989a, Stochastic analysis of nonstationary subsurface solute transport, 1. Unconditional moments, Water Resour. Res. 25(2), 215–232.
Graham, W. and McLaughlin, D.: 1989b, Stochastic analysis of nonstationary subsurface solute transport, 2. Conditional moments, Water Resour. Res. 25(11), 2311–2356.
Hsueh, Y. W. and Rajagopal, R: 1988, Modeling groundwater quality sampling decisions, Ground Water Monitor. Rev., 121–134.
Knopman, D. S. and Voss, C. I.: 1989, Multiobjective sampling design for parameter estimation and model discrimination in groundwater solute transport, Water Resour. Res. 25(10): 2245–2258.
Lee, S.-I. and Kitanidis, P. K.: 1991, Optimal estimation and scheduling in aquifer remediation with incomplete information, Water Resour. Res. 27(9): 2203–2217.
Loaiciga, H. A.: 1988, Groundwater monitoring network design, in: M. A. Celia, L. A. Ferrand, C. A. Brebia, N. G. Gray, and G. F. Pinder (eds.), Proc. VII Intl. Conf. Computational Methods in Water Resources, Computational Mechanics Publications/Elsevier, New York, vol 2, pp. 371–376.
Loaiciga, H. A.: 1989, An optimization approach for groundwater quality monitoring network design, Water Resour. Res., 25(8): 1771–1782.
Loaciga, H. A., Charbeneau, R. J., Everette, L. G., Fogg, G. E., Hobbs, B. F. and Rouhani, S.: 1992, Review of ground water quality monitoring network design, J. Hydraulic Engineering 118(1), 11–37, 1992.
Massmann, J. and Freeze, R. A.: 1987a, Groundwater contamination from waste management site: The interaction between risk-based engineering design and regulatory policy, 1, Methodology. Water Resour. Res. 23(2), 351–367.
Massmann, J. and Freeze, R. A.: 1987b, Groundwater contamination from waste management site: The interaction between risk-based engineering design and regulatory policy, 2, Results, Water Resour. Res. 23(2), 368–380.
McKinney, D. C. and Loucks, D. P.: 1992, Network design for predicting groundwater contamination, Water Resour. Res. 28(1), 133–147, 1992.
Mehra, R. K.: 1970, On the identification of variances and adaptive Kalman Filtering, IEEE Trans. Autom. Contr. AC 15(2), 175–184.
Meyer, P. D. and Brill, E. D. Jr.: 1988, A method for locating wells in a groundwater monitoring network under conditions for uncertainty, Water Resour. Res. 24(8), 1277–1282.
Rouhani, S.: 1985, Variance reduction analysis, Water Resour. Res. 21(6), 837–846.
Rouhani, S. and Hall, T. J.: 1988, Geostatistical schemes for groundwater sampling, J. Hydrology 103, 85–102.
Schlee, F. H., Standish, C. J. and Toda, F.: 1967, Divergence in the Kalman filter, AIAA J., 5, pp. 1114–1120.
Tucciarelli, T. and Pinder, G.: 1991, Optimal data acquisition strategy for the development of a transport model for groundwater remediation, Water Resour. Res. 27(4), 577–588, 1991.
Woldt, W. and Bogardi, I.: 1992, Ground water monitoring network design using multiple criteria decision making and geostatistics, Water Resour. Bull. 28(1), 45–62.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Lee, SI., Kitanidis, P.K. Optimization of monitoring well installation time and location during aquifer decontamination. Water Resour Manage 10, 439–462 (1996). https://doi.org/10.1007/BF00422549
Received:
Revised:
Issue Date:
DOI: https://doi.org/10.1007/BF00422549