Conclusions
-
1.
Use of the tunneling method for excavating the cut for the dam core made it possible to place the loam in the dam core simultaneously with the preparatory work for blasting at the higher levels.
-
2.
The distribution of the heap of blasted rock over a large area made it possible to use several excavators and, consequently, to reduce the time of completing the work.
-
3.
In this method, it is not necessary to construct additional dropping places at the working levels.
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 7–9, April, 1977.
Rights and permissions
About this article
Cite this article
Bondar', I.Y., Bagdasarov, A.G. & Erofeev, E.V. Excavation of core cut for the Nurek nydroelectric plant dam. Hydrotechnical Construction 11, 345–347 (1977). https://doi.org/10.1007/BF02399245