ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
  • International Union of Crystallography (IUCr)  (6)
  • Emerald
  • Periodicals Archive Online (PAO)
  • Geological Society of America (GSA)
  • 2000-2004  (2)
  • 1995-1999  (8)
  • 1950-1954  (6)
Collection
Years
Year
  • 11
    Electronic Resource
    Electronic Resource
    Chester : International Union of Crystallography (IUCr)
    Journal of synchrotron radiation 6 (1999), S. 1174-1184 
    ISSN: 1600-5775
    Source: Crystallography Journals Online : IUCR Backfile Archive 1948-2001
    Topics: Geosciences , Physics
    Notes: An undulator beamline and small-angle-scattering spectrometer have been implemented at the Advanced Photon Source. The beamline is optimized for performing small-angle wide-bandpass coherent X-ray scattering measurements, and has been characterized by measuring static X-ray speckle patterns from isotropically disordered samples. Statistical analyses of the speckle patterns have been performed from which the speckle widths and contrast are extracted versus wavevector transfer and sample thickness. The measured speckle widths and contrast are compared with an approximation to the intensity correlation function and found to be in good agreement with its predictions.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 12
    Electronic Resource
    Electronic Resource
    Chester : International Union of Crystallography (IUCr)
    Journal of synchrotron radiation 5 (1998), S. 37-47 
    ISSN: 1600-5775
    Source: Crystallography Journals Online : IUCR Backfile Archive 1948-2001
    Topics: Geosciences , Physics
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 13
    Electronic Resource
    Electronic Resource
    Bingley : Emerald
    International journal of quality & reliability management 14 (1997), S. 834-848 
    ISSN: 0265-671X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Economics
    Notes: States that the time taken to deliver a product to the market determines a company's success, and that research has shown that a delay of six months leads to 33 per cent of its potential profit being lost. Explores the existing method of assessing new product reliability, namely reliability demonstrating testing, and presents its numerous shortcomings and deficiencies. Analyses the results of performing reliability demonstration testing on eight products which support the viewpoint that it is no longer appropriate. Proposes a SURGE (stress unveiled reliability growth enhancement) process, leading to significant saving in development time and thereby time-to-market while providing a more reliable product and process. Places emphasis on the control of all of the development processes, design, manufacturing, and materials procurement and producing prototype units via the intended volume process. Performs monitoring by appropriate stress testing designed to precipitate all potential defects and involves testing beyond design specification. By correcting defects on the product, and ultimately on the processes which produced them, develops more reliable products. Concludes that the results of the SURGE process have led to a reduction in development times of 14 per cent while also reducing the time taken to ramp up to full volume production by 50 per cent.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 14
    Electronic Resource
    Electronic Resource
    Copenhagen : International Union of Crystallography (IUCr)
    Acta crystallographica 5 (1952), S. 185-186 
    ISSN: 0001-5520
    Source: Crystallography Journals Online : IUCR Backfile Archive 1948-2001
    Topics: Geosciences
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 15
    Electronic Resource
    Electronic Resource
    Bingley : Emerald
    Facilities 18 (2000), S. 312-323 
    ISSN: 0263-2772
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: This paper promotes an overview of facilities management (FM) and the impact of information technology (IT). It opens with a definition of FM automation and a brief history of the generations of development. This is followed by key demand impacts which have both enabled and stimulated the growth of FM automation during the past and into the future. Specific attention is then given to the tactical and strategic impacts of the technology affecting the organisation within the emerging and complex business environment. Some examples are cited together with the effects of discontinuous change and the resistance to such change. Finally, a brief look at the impact of system selection is also included to assist FM organisations in their determination of automation needs within the paradigms of change, complexity and dependence.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 16
    Electronic Resource
    Electronic Resource
    Bingley : Emerald
    International journal of quality & reliability management 13 (1996), S. 77-90 
    ISSN: 0265-671X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Economics
    Notes: Argues that in the coming years the present methods of demonstrating reliability will no longer be feasible and alternative methods must be found. Deals with building-in reliability (BIR) and the necessity to change from the standard end-of-line-measurement technique of life test to a more proactive in-line approach, where reliability can be measured by process parameters and reaction time is immediate, resulting in a continuous flow of reliable product to the end user. This approach will not eliminate the use of end-of-line monitoring, but will reduce the amount which needs to be carried out. Suggests that it will only be done to demonstrate that processes are operating to certain maximum failure rates, where the online controls will in fact guarantee that the reliability is much greater than that being demonstrated. Examines the customers' attitude towards reliability, and points out that sharing of data will be essential if the BIR approach is to be successful. Outllines two examples which demonstrate the effectiveness of a BIR program and explains how, if implemented, it can be used to prevent the manufacture of potentially unreliable product.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...