ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
  • Inorganic Chemistry  (2)
  • ADMINISTRATION AND MANAGEMENT  (1)
  • 1995-1999
  • 1980-1984  (1)
  • 1955-1959
  • 1910-1914  (2)
Collection
Publisher
Years
  • 1995-1999
  • 1980-1984  (1)
  • 1955-1959
  • 1910-1914  (2)
Year
  • 1
    Electronic Resource
    Electronic Resource
    Weinheim : Wiley-Blackwell
    Zeitschrift für anorganische Chemie 82 (1913), S. 278-282 
    ISSN: 0863-1778
    Keywords: Chemistry ; Inorganic Chemistry
    Source: Wiley InterScience Backfile Collection 1832-2000
    Topics: Chemistry and Pharmacology
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    Weinheim : Wiley-Blackwell
    Zeitschrift für anorganische Chemie 80 (1913), S. 93-103 
    ISSN: 0863-1778
    Keywords: Chemistry ; Inorganic Chemistry
    Source: Wiley InterScience Backfile Collection 1832-2000
    Topics: Chemistry and Pharmacology
    Notes: Aus den Versuchen ergibt sich, daß Cuprohydrid bei der Reaktion zwischen Kupfersulfat und unterphosphoriger Säure entsteht, daß aber die Reinheit des Produktes von begrenzten Versuchsbedingungen, besonders von Temperatur und Zeit abhängt. Die Versuche bei gewöhnlicher Temperatur zeigen, daß nach mehrstündigem Stehen das Produkt Hydrid und Oxyd enthält, und auf die Koexistenz dieser beiden Stoffe ist die Explosionsfähigkeit der trockenen Substanz bei Berührung mit Luft zurückzuführen.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    facet.materialart.
    Unknown
    In:  CASI
    Publication Date: 2019-06-28
    Description: A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.
    Keywords: ADMINISTRATION AND MANAGEMENT
    Type: NASA-TM-82419
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...