ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    The international journal of advanced manufacturing technology 13 (1997), S. 342-349 
    ISSN: 1433-3015
    Keywords: Automation ; Fixture set-up ; Inspection
    Source: Springer Online Journal Archives 1860-2000
    Topics: Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics
    Notes: Abstract This paper presents an automated fixture set-up for inspection. The system comprises a workplace with magazines, locators and a baseplate. An articulated robot, the SCORBOT-ER VII is used to automate the system. A C-program is developed and used to execute robot arm movements based on user input. The C-program also establishes locating postions for a rectangular workpiece and determines the set-up of the locating fixtures via points. The program is therefore a useful interface to other small-scale expert systems for fixture design and graphical simulators. The set-up of the fixtures can be performed for other complex shapes if locating points are known, and input into the robot controller using the C-program.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...