ISSN:
0278-4513
Keywords:
Chemistry
;
Chemical Engineering
Source:
Wiley InterScience Backfile Collection 1832-2000
Topics:
Chemistry and Pharmacology
,
Process Engineering, Biotechnology, Nutrition Technology
Notes:
High labor, capital equipment, and variable costs, together with lethally expensive downtime have made ammonia producers seek ways of extending their production runs between major overhauls. This paper outlines operating and maintenance policies together with some of the actions taken at the Kemira (formerly UKF Fertilizers) Ince plant to achieve this objective without compromising plant safety.
Additional Material:
17 Ill.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1002/prsb.720080208
Permalink