Electronic Resource
[S.l.]
:
American Institute of Physics (AIP)
Review of Scientific Instruments
57 (1986), S. 733-734
ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
The project to add an 8-MV tandem accelerator to the VICKSI facility is nearing completion. The status of the project is given and the tests and their results during commissioning of the tandem are described.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1138845
Permalink
|
Location |
Call Number |
Expected |
Availability |