ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 11 (2004), S. 113-125 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: The single project paradigm which dominates the literature of both project and construction management research does not accurately reflect the reality of many construction clients, who have large ongoing construction portfolios rather than one-off construction projects. Although several concepts of multi-project environments (MPEs) exist, an investigation of the form and dynamic interactions of components within MPEs of construction clients was lacking. This paper presents the factors identified as exerting greatest influence on project delivery within construction clients' MPEs.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    Oxford : Emerald
    Engineering, construction and architectural management 10 (2003), S. 263-271 
    ISSN: 1365-232X
    Source: Emerald Fulltext Archive Database 1994-2005
    Topics: Architecture, Civil Engineering, Surveying
    Notes: In this study, artificial neural networks have been developed to acquire construction knowledge from past projects to integrate buildability considerations into the preliminary structural design process. Four artificial neural network models are presented. These allow the generation of an expeditious solution for given sets of design and buildability constraints. Once information is entered into the models, a recommendation of which structural scheme to choose is generated instantaneously. Thus, valuable design time is released, allowing designers the opportunity to invest in other equally important design tasks. The information entered into the models consists of site-related information including site access; availability of working space; and speed of erection, and conceptual design information including type of building; number of storeys and gross floor area. The results show that artificial neural networks can be successfully used for the implementation of buildability at the preliminary stage of design.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    facet.materialart.
    Unknown
    Oxford : Periodicals Archive Online (PAO)
    Economic Inquiry. 5:1 (1966:Dec.) 105 
    ISSN: 0095-2583
    Topics: Economics
    Description / Table of Contents: REGIONAL ECONOMIC ANALYSIS
    Notes: ABSTRACTS: FORTY-FIRST ANNUAL CONFERENCE OF THE WESTERN ECONOMIC ASSOCIATION
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Publication Date: 2019-03-19
    Description: The construction industry is faced with many challenges, among which is waste management. Aside from the fact that wastage contributes to time and cost overrun, it also has environmental implications in the form of pollution. However, the industry has the capacity to effectively manage waste, from generation to disposal. All stages of the management process are important, but scholars and governments have provided the final step, being disposal, unabated attention in order to ensure effective management. Potential waste disposal methods, including incineration, burning, landfilling, recycling, reuse, open dumping, pyrolysis, and shredding have emerged from the literature around the globe. Despite various waste minimisation and sustainable disposal options that are available, construction material waste is still increasing in Nigeria, while disposal remains a major issue for firms and government. Therefore, this study assesses disposal methods among construction firms to determine whether there is a relationship between their practices towards waste disposal. The research followed a concurrent triangulation design in a cross sectional survey, while data were collected via a convergent parallel mixed methods. The quantitative phase employed a structured questionnaire to collect data from 243 building construction firms, while the qualitative phase involved semi-structured interviews with 65 professionals from 10 on-going construction projects in Lagos, Nigeria. The research revealed that landfilling is the most common method of waste disposal, which is closely followed by reuse as backfill and recycling. In addition, the study revealed no association between company’s ownership statuses, age, project specialisation, and disposal methods, except company’s size. In conclusion, the study establishes the need for regulatory policies, such as site waste management plan (SWMP), pay as you throw (PAYT), and landfill ban, which would minimise material waste and divert them from landfills. Recycling and reuse are recommended as sustainable approaches for waste disposal.
    Electronic ISSN: 2313-4321
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...