Publication Date:
2019-07-13
Description:
Problem Introduction: 1. Prevent Cold Plate Damage in Space Shuttle. 1a. The number of cold plate problems had increased from an average of 16.5 per/year between 1990 through 2000, to an average of 39.6 per year between 2001through 2005. 1b. Each complete set of 80 cold plates cost approximately $29 million, an average of $362,500 per cold plate. 1c It takes four months to produce a single cold plate. 2. Prevent Cold Plate Damage in Future Space Vehicles.
Keywords:
Quality Assurance and Reliability
Type:
KSC-2012-054RR
,
KSC-2011-038R
,
KSC-2011-038
,
2012 IEEE Aerospace Conference; Mar 03, 2012 - Mar 10, 2012; Big Sky, MT; United States
Format:
application/pdf
Permalink