ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
Beam from the accelerator for research was available for a total period of 3900 h last year and unscheduled maintenance time was reduced by a factor of almost 2. An arc discharge tube conditioning test was conducted on the top five units of the accelerator and a test with macropulsed beam was accomplished. The main problems during the year were vacuum leaks and voltage "tics.''
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1138896
Permalink