ISSN:
1573-9139
Source:
Springer Online Journal Archives 1860-2000
Topics:
Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics
Notes:
Conclusions The maximum settling of the ground is noted in zone III for transport formation of the dumps (autotransport). Settling of the ground in zones I and II is about the same for different lives of the dumps, that is, during the formation of the dumps by the combined system of working the rocks were more densely compacted in the dump than during the nontransport system.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1007/BF01286446
Permalink