ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Publication Date: 2005-11-27
    Description: General purpose computer for onboard processing of data for OAO missions
    Keywords: COMPUTERS
    Type: OPT. TELESCOPE TECHNOL. 1970; P 693-697
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2011-08-16
    Description: Digital PCM telemetry link coding techniques, discussing encoding-decoding complexity, and concatenated block scheme for channel
    Keywords: COMMUNICATIONS
    Type: ; ADEMIE DES SCIENCES
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    Publication Date: 2011-08-19
    Keywords: GEOPHYSICS
    Type: NASA, Washington Upper Atmosphere Res. Program; p 209
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Publication Date: 2014-09-17
    Description: Past application of the gravity gradient concept to satellite attitude control produced attitude stabilities of from 1 to 10 degrees. The satellite members were rigigly interconnected and any motion in one part of the satellite would cause motion in all members. This experience has restricted gravity gradient stabilization to applications that need attitude stability no better than 1 degree. A gravity gradient technique that combines the flexible tether with an active control that will allow control stability much better than 1 degree is proposed. This could give gravity gradient stabilization much broader application. In fact, for a large structure like a space station, it may become the preferred method. Two possible ways of demonstrating the techniques using the Tethered Satellite System (TSS) tether to control the attitude of the shuttle are proposed. Then a possible space station tether configuration is shown that could be used to control the initial station. It is then shown how the technique can be extended to the control of space stations of virtually any size.
    Keywords: MECHANICAL ENGINEERING
    Type: NASA. Marshall Space Flight Center Appl. of Tethers in Space, Vol. 2; 10 p
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Publication Date: 2011-08-19
    Description: This paper describes the requirements that the polar platform will have to meet if it is to satisfy the needs of the scientific earth observation communities in the early 1990s. The Eos is a prime mission for the polar platform. The polar platform will be a large satellite in a sun synchronous orbit that could be built up from the same components that are to be used to build the Space Station and its co-orbiting freeflying satellite. It will be serviced from the Shuttle so that it will be kept in operation and up-to-date for at least a decade. An initial set of scientific requirements has been documented by a Science and Missions Requirements Working Group (S&MRWG). These scientific requirements have been translated into derived technical requirements for the polar platform. These derived requirements are presented.
    Keywords: SPACECRAFT INSTRUMENTATION
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 6
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2019-06-28
    Description: The Slinger, a permanent facility that can be built and stationed in a low earth orbit and can reduce the cost of transporting satellites into geostationary orbit by a factor of three, is examined. The Slinger is described, giving its size, mass, capacity, and the construction of its tethers. Techniques for accelerating the tethers are discussed. The operation of the Slinger is examined, including its launching of a payload into geostationary transfer orbit (GTO) and its return to lower orbit. The Slinger's cycle time, its handling of lighter GTO payloads, and the effects of orbital precession and drag are briefly discussed. A possible reusable second stage based at the Slinger is discussed, and missions involving higher velocity and heavier payloads that can be helped by the Slinger are briefly considered along with the use of the Slinger to provide astronauts with 1 g and the use of a Slinger on the moon.
    Keywords: LAUNCH VEHICLES AND SPACE VEHICLES
    Type: AIAA PAPER 86-2175
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 7
    Publication Date: 2019-05-29
    Description: System of square loop magnetic cores associated with code input registers to react to input code patterns by reference to a group of control cores in such a manner that errors are canceled and patterns containing errors are accepted for amplification and processing. This technique improves reception capabilities in PCM telemetry systems.
    Keywords: ELECTRONIC COMPONENTS AND CIRCUITS
    Type: GSC-541
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 8
    Publication Date: 2019-05-29
    Description: Unusual transistor connection that substitutes for a silicon diode and allows significantly higher repetition rates without increasing power loss rectifies an alternating current. Operation speed is improved by a factor of 10 or more when a given diode is replaced by this transistor circuit.
    Keywords: ELECTRONIC COMPONENTS AND CIRCUITS
    Type: GSC-474
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 9
    Publication Date: 2019-06-27
    Description: Automatic Frequency Control system compensates for Doppler shift in two-way communication systems where one or both stations are moving. This automatic correction can be applied to the reply link to elimate frequency search for the reply or an excessive bandwidth to accommodate the Doppler.
    Keywords: ELECTRONIC COMPONENTS AND CIRCUITS
    Type: GSC-10213
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 10
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2019-07-13
    Description: Onboard spacecraft computer design, programming and operation based on dual bussing system
    Keywords: COMPUTERS
    Type: ONBOARD COMPUTERS ON ROCKETS AND SATELLITES, CENTRE NATIONAL D''ETUDES SPATIALES, INTERNATIONAL CONFERENCE; Dec 03, 1968 - Dec 06, 1968; PARIS; FRANCE
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...