ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Electronic Resource
    Electronic Resource
    Springer
    International journal of flexible manufacturing systems 8 (1996), S. 183-201 
    ISSN: 1572-9370
    Keywords: Flexible manufacturing system ; tool management ; clustering ; scheduling
    Source: Springer Online Journal Archives 1860-2000
    Topics: Mechanical Engineering, Materials Science, Production Engineering, Mining and Metallurgy, Traffic Engineering, Precision Mechanics
    Notes: Abstract Tool management is recognized as a critical issue in flexible manufacturing facilities management. This article addresses the issue of tool management in a flexible system installed in an avionics components factory. The system is composed of two machining centers equipped with local tool magazines of limited capacity. A tool handling system is in charge of tool movements between the tool room and the two machines. Each machine is able to perform any operation, provided that it is equipped with the suitable tool. In this kind of installation, tool allocation must be determined, and tool movements must be synchronized in order to minimize operating costs, or, equivalently, maximize the productivity of the system. We propose an approach to production planning based on a clustering algorithm, which takes into account the tool requirements of each part program in the production batch. We also propose two different heuristics for the scheduling problem. A case study was conducted on the facility mentioned above. Two conflicting objectives can be identified for this kind of production system: the reduction of tools to be shared among machines and the reduction of workload unbalance. The tests and comparison made demonstrate how the proposed procedure leads to superior results in terms of both objectives.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Publication Date: 2019-12-23
    Description: The optimization of production processes has always been one of the cornerstones for manufacturing companies, aimed to increase their productivity, minimizing the related costs. In the Industry 4.0 era, some innovative technologies, perceived as far away until a few years ago, have become reachable by everyone. The massive introduction of these technologies directly in the factories allows interconnecting the resources (machines and humans) and the entire production chain to be kept under control, thanks to the collection and the analyses of real production data, supporting the decision making process. This article aims to propose a methodological framework that, thanks to the use of Industrial Internet of Things—IoT devices, in particular the wearable sensors, and simulation tools, supports the analyses of production line performance parameters, by considering both experimental and numerical data, allowing a continuous monitoring of the line balancing and performance at varying of the production demand. A case study, regarding a manual task of a real manufacturing production line, is presented to demonstrate the applicability and the effectiveness of the proposed procedure.
    Electronic ISSN: 1424-8220
    Topics: Chemistry and Pharmacology , Electrical Engineering, Measurement and Control Technology
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    Publication Date: 2020-10-30
    Description: The aging issue in the work context is becoming a significant element of the future sustainability of service and industrial companies. It is well known that with increasing worker age the problem of maintaining the performance and the safety level when fatigue increases is a crucial point, and fatigue increases with the age. Due to social and political developments, especially in Western countries, the retirement age is increasing and companies operate with a higher workforce mean age. Therefore, the problem of recognizing and measuring fatigue has become a key aspect in the management of aging. Note that in the scientific engineering field, the problem of fatigue evaluation when a worker is performing his/her work activities is an important issue in the industrial and service world and especially in the context of the researchers that are investigating the human reliability assessment. As it is clear from the literature, the industrial operations management are suffering from some misleading concepts that only the medicine scientific context can clarify. Therefore, the aim of this paper is to define what are the open issues and the misleading concepts present in the classical fatigue evaluation methods, and second to define two experimental curves of fatigue that will help the decision makers to minimize the impact of fatigue on the workers, thus maximizing the sustainability of the working tasks assigned. This aim is achieved by examining the medical literature about the measurement of a particular kind of fatigue related to the circadian cycle, i.e., the cognitive one; after that, a survey about the possible technologies for measurements is performed. On the basis of technology selection, an experiment on real work activities is performed and some remarkable results about the fatigue in the workers observed and the technology use and its limitations are defined.
    Electronic ISSN: 2076-3417
    Topics: Natural Sciences in General
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Publication Date: 2020-12-03
    Description: Aircrafts are responsible for a significant environmental impact mainly due to the air pollution caused by their motors. The use of composite materials for their production is a way to significantly reduce the weight of the structures and to maximise the ratio between the payload weight and the gasoline consumption. Moreover, the design phase has to consider the cost of different operations performed during the aircraft service life. During the entire life cycle, one of the main costs is the maintenance one. In the current literature, there is a lack of knowledge of methods for maintenance cost estimation in the aircraft industry; moreover, very few environmental assessment methods have been developed. Thus, the aim of this paper is to define a new method to support the aircraft design process; both the environmental and the economic dimensions have been included with the purpose of assessing the aircraft sustainability during its service life. A green index has been identified mixing the maintenance cost and an environmental parameter with the aim of identifying the greenest solution. A final practical application shows the feasibility and the simple application of the proposed approach.
    Electronic ISSN: 2071-1050
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Publication Date: 2021-03-31
    Description: Background: In this study, we promote a global approach to occupational risk perception in order to improve occupational health and safety training programs. The study investigates the occupational risk perception of operating room healthcare workers using an Analytic Hierarchy Process approach. Methods: A pilot study was carried out through a cross-sectional survey in a university hospital in Southern Italy. An ad hoc questionnaire was administered to enrolled medical post-graduate students working in the operating room. Results: Fifty medical specialists from seven fields (anaesthetists, digestive system surgeons, general surgeons, maxillofacial surgeons, thoracic surgeons, urologists, and gynaecologists) were questioned about perceived occupational risk by themselves. Biological, ionizing radiation, and chemical risks were the most commonly perceived in order of priority (w = 0.300, 0.219, 0.210). Concerning the biological risk, gynaecologists unexpected perceived this risk as less critical (w = 0.2820) than anaesthesiologists (w = 0.3354), which have the lowest perception of the risk of ionizing radiation (w = 0.1657). Conclusions: Prioritization methods could improve risk perception in healthcare settings and help detect training needs and perform sustainable training programs.
    Electronic ISSN: 2071-1050
    Topics: Energy, Environment Protection, Nuclear Power Engineering
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...