ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Publication Date: 2013-08-31
    Description: An 8.4-GHz front-end system consisting of a feedhorn, a waveguide feed assembly, dual masers, and downconverters was reimplemented at Parkes as part of the Parkes Canberra Telemetry Array for the Voyager Neptune encounter. The front-end system was originally assembled by the European Space Agency and installed on the Parkes antenna for the Giotto project. It was also used on a time-sharing basis by the Deep Space Network as part of the Parkes Canberra Telemetry Array to enhance the data return from the Voyager Uranus encounter. At the conclusion of these projects in 1986, part of the system was then shipped to JPL on loan for reimplementation at Parkes for the Voyager Neptune encounter. New design and implementation required to make the system operable at Parkes included new microwave front-end control cabinets, closed-cycle refrigeration monitor system, noise-adding radiometer system, front-end controller assembly, X81 local oscillator multiplier, and refurbishment of the original dual 8.4-GHz traveling-wave masers and waveguide feed system. The front-end system met all requirements during the encounter and was disassembled in October 1989 and returned to JPL.
    Keywords: LASERS AND MASERS
    Type: The Telecommunications and Data Acquisition Report; p 301-319
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Publication Date: 2018-06-08
    Description: This paper presents an overview of this development process with emphasis on comparison between modeled and measured, LNA modules, front-end receiver packages employing these modules, and antennae employing these packages.
    Keywords: Engineering (General)
    Type: IEEE 2001 Aerospace Conference; Big Sky, MT; United States
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2019-06-28
    Description: A cryogenic cooled, low-noise Field Effect Transistor (FET) amplifier assembly for use at 2.2 to 2.3 GHz was developed for the DSN to meet the requirements of a Very Long Baseline Interferometry (VLBI) upgrade. An amplifier assembly was developed at JPL that uses a commercial closed-cycle helium refrigerator (CCR) to cool a FET amplifier to an operating temperature of 15 K. A cooled probe waveguide-to-coaxial transition similar to that used in the research and development Ultra-Low-Noise S-band Traveling Wave Maser (TWM) is used to minimize input line losses. Typical performance includes an input flange equivalent noise contribution of 14.5 K, a gain slope of less than 0.05 dB/MHz across a bandwidth of 2.2 to 2.3 GHz, an input VSWR of 1.5:1 at 2.25 GHz, and an insertion gain of 45 + or - 1 dB across the bandwidth of 2.2 to 2.3 GHz. Three 2.3 GHz FET/CCR assemblies were delivered to the DSN in the spring of 1987.
    Keywords: ELECTRONICS AND ELECTRICAL ENGINEERING
    Type: The Telecommunications and Data Acquisition Report; p 199-206
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Publication Date: 2019-06-28
    Description: An 8.4 GHz front-end system consisting of a feedhorn, a waveguide feed assembly, dual masers, and downconverters is being reimplemented at Parkes as part of the Parkes-Canberra Telemetry Array for the Voyager Neptune encounter. The front-end system was originally assembled by the European Space Agency on the Parkes antenna for the Giotto project. It was also used on a time-sharing basis by the DSN as part of the Parkes-Canberra Telemetry Array to enhance the data return from Voyager 2 at Uranus. At the conclusion of these projects in 1986, the front-end system was dismantled, packed, and shipped to Europe. Part of the system was then shipped to JPL on loan for reimplementation at Parkes for the Voyager Neptune encounter. The system is being redesigned and refurbished for operation at Parkes. Tasks include new microwave front-end control cabinets, a closed-cycle refrigeration data acquisition system, a new noise-adding radiometer system, a front-end controller assembly, and refurbishment of the dual 8.4 GHz traveling-wave masers (TWMs) and waveguide feed system.
    Keywords: LASERS AND MASERS
    Type: The Telecommunications and Data Acquisition Report; p 214-228
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...