    Publication Date: 2011-08-19
    Description: A most pressing problem in space exploration is timely spacecraft power system sequence generation, which requires the scheduling of a set of loads given a set of resource constraints. This is particularly important after an anomaly or failure. This paper discusses the power scheduling problem and how the software program, Plan-It, can be used as a consultant for scheduling power system activities. Modeling of power activities, human interface, and two of the many strategies used by Plan-It are discussed. Preliminary results showing the development of a conflict-free sequence from an initial sequence with conflicts is presented. It shows that a 4-day schedule can be generated in a matter of a few minutes, which provides sufficient time in many cases to aid the crew in the replanning of loads and generation use following a failure or anomaly.
    Keywords: CYBERNETICS
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Publication Date: 2011-08-18
    Description: Major advances in photovoltaic (PV) Power Conditioning (PC) with respect to performance and low-cost potential have been made. Solutions have been obtained to interface and control problems related to adapting available inverter designs to the grid-connected, residential photovoltaic experiments. A description is presented to contributing research and development activities. Attention is given to aspects of residential systems experience, conceptual design studies, questions of optimum topology development, and promising advanced designs for residential PV provided by development efforts of the private sector.
    Keywords: ENERGY PRODUCTION AND CONVERSION
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    facet.materialart.
    Unknown
    In:  Other Sources
    Publication Date: 2011-08-18
    Description: It has been recognized in the photovoltaic (PV) industry that even in the event of a dramatic reduction in the price of generating PV cells, the costs for the other components of the system represent still a major obstacle towards commercialization. A project was, therefore, initiated with the aim to develop baseline and conceptual power conditioner designs which would attempt to meet a specified set of cost and performance goals in the 30 to 200 kW (Intermediate) size. Resulting Intermediate Size Power Conditioner Studies led to a number of conclusions. There is a need for a set of guidelines or standards for utility interconnection. The advent of new devices with more power handling capability will change the desired topology.
    Keywords: ELECTRONICS AND ELECTRICAL ENGINEERING
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Publication Date: 2019-06-28
    Description: This project was part of an international program under which the chemical composition of cometary dust particles was to be measured 'in situ' during a rendezvous and flyby mission of a Mariner Mark 2 space probe and a comet (depending on the time of launch). Two necessary tasks, preliminary hardware development and interface definition, have been completed within the projects submitted for approval. As a result a model close to the flight configuration has been created, which was to be made available to the flight hardware contractor and his purposes. The Comet Rendezvous and Asteroid Flyby (CRAF) mission was abandoned after joint resolution adopted by NASA and the Federal Ministry for Research and Technology in 1992. Since an instrument like CoMA is an important contribution both to future cometary rendezvous missions, such as ROSETTA, as well as for accompanying laboratory activities, this project was terminated in a 'qualified conclusion'. In the process, components suitable for the laboratory developed from the preliminary units were produced and put into operation.
    Keywords: Spacecraft Instrumentation
    Type: NASA-CR-202230 , NAS 1.26:202230
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Publication Date: 2019-06-28
    Description: The interface issues between the intermediate-size Power Conditioning Subsystem (PCS) and the utility are considered. A literature review yielded facts about the status of identified issues.
    Keywords: ENERGY PRODUCTION AND CONVERSION
    Type: NASA-CR-169664 , JPL-PUB-82-63 , NAS 1.26:169664
    Format: application/pdf
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...