Publication Date:
2018-01-10
Description:
Author(s): J. Roberts, P. Skowronski, P. N. Burrows, G. B. Christian, R. Corsini, A. Ghigo, F. Marcellini, and C. Perry We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The... [Phys. Rev. Accel. Beams 21, 011001] Published Tue Jan 09, 2018
Keywords:
High-Energy Accelerators and Colliders
Electronic ISSN:
1098-4402
Topics:
Physics
Permalink