ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Ihre E-Mail wurde erfolgreich gesendet. Bitte prüfen Sie Ihren Maileingang.

Leider ist ein Fehler beim E-Mail-Versand aufgetreten. Bitte versuchen Sie es erneut.

Vorgang fortführen?

Exportieren
Filter
  • 1
    Publikationsdatum: 2013-08-31
    Beschreibung: The Earth Radiation Budget Satellite (ERBS), Compton Gamma Ray Observatory (CGRO), Upper Atmosphere Research Satellite (UARS), and Extreme Ultraviolet Explorer (EUVE) spacecraft are operated from NASA's Goddard Space Flight Center (GSFC) in Greenbelt, Maryland. On-board power subsystems for each satellite employ NASA Standard 50 Ampere-hour (Ah) nickel-cadmium batteries in a parallel configuration. To date, these batteries have exhibited degradation over periods from several months (anomalous behavior, UARS and CGRO (MPS-1); to little if any, EUVE) to several years (old age, normal behavior, ERBS). Since the onset of degraded performance, each mission's Flight Operations Team (FOT), under the direction of their cognizant GSFC Project Personnel and Space Power Application Branch's Engineers has closely monitored the battery performance and implemented several charge control schemes in an effort to extend battery life. Various software and hardware solutions have been developed to minimize battery overcharge. Each of the four sections of this paper covers a brief overview of each mission's operational battery management and its associated spacecraft battery performance. Also included are new operational procedures developed on-orbit that may be of special interest to future mission definition and development.
    Schlagwort(e): ELECTRONICS AND ELECTRICAL ENGINEERING
    Materialart: Third International Symposium on Space Mission Operations and Ground Data Systems, Part 1; p 399-408
    Format: application/pdf
    Standort Signatur Erwartet Verfügbarkeit
    BibTip Andere fanden auch interessant ...
  • 2
    Publikationsdatum: 2019-08-16
    Beschreibung: A description of the deep-discharge event associated with UARS on-board batteries is given along with the immediate results of this event. The failures of 2nd UARS earth sensor in respect to battery currents, state-of-charge, battery temperatures, battery differential voltages and load bus voltage vs. time are graphically represented.
    Schlagwort(e): Energy Production and Conversion
    Materialart: The 1995 NASA Aerospace Battery Workshop; 199-210; NASA-CP-3325
    Format: text
    Standort Signatur Erwartet Verfügbarkeit
    BibTip Andere fanden auch interessant ...
Schließen ⊗
Diese Webseite nutzt Cookies und das Analyse-Tool Matomo. Weitere Informationen finden Sie hier...