Publication Date:
2017-06-20
Description:
Author(s): H. Hotchi, H. Harada, N. Hayashi, S. Kato, M. Kinsho, K. Okabe, P. K. Saha, Y. Shobuda, F. Tamura, N. Tani, Y. Watanabe, K. Yamamoto, M. Yamamoto, and M. Yoshimoto The 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) is now in the final beam commissioning phase, aiming for a design output beam power of 1 MW. With a series of injector linac upgrades in 2013 and 2014, RCS developed a high-intensity beam test, and la… [Phys. Rev. Accel. Beams 20, 060402] Published Mon Jun 19, 2017
Keywords:
Pulsed-Power Accelerators, Technology, and Dynamics
Electronic ISSN:
1098-4402
Topics:
Physics
Permalink