ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
  • 1980-1984  (24)
Collection
Years
Year
  • 1
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 20 (1984), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 17 (1981), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 17 (1981), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Notes: While storm water detention basins are widely used for controlling increases in peak discharges that result from urbanization, recent research has indicated that under certain circumstances detention storage can actually cause increases in peak discharge rates. Because of the potential for detrimental downstream effects, storm water management policies often require downstream effects to be evaluated. Such evaluation requires the design engineer to collect additional topographic and land use data and make costly hydrologic analyses. Thus, a method, which is easy to apply and which would indicate whether or not a detailed hydrologic analysis of downstream impacts is necessary, should decrease the average cost of storm water management designs. A planning method that does not require either a large data base or a computer is presented. The time co-ordinates of runoff hydrographs are estimated using the time-of-concentration and the SCS runoff curve number; the discharge coordinates are estimated using a simple peak discharge equation. While the planning method does not require a detailed design of the detention basin, it does provide a reasonably accurate procedure for evaluating whether or not the installation of a detention basin will cause adverse downstream flooding.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 6
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Notes: : The fact that dams have failed indicates that there is still a risk involved, in spite of the major effort to ensure reliability. In seeking ways to reduce the risk, all aspects of the design, construction, monitoring, inspection, and rehabilitation of earth dams should be examined. Because dam classification is a central element, ways of minimizing uncertainty associated with classification need to be considered. A Bayesian approach to classification has numerous advantages over existing methods of earth dam classification because it directly evaluates the effects of uncertainties. A framework for incorporating Bayesian decision theory into the classification process is presented.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 7
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Notes: : Snowmelt runoff is a primary source of water supply in much of the Western United States. Multipurpose planning requires long-range forecasts and the accuracy of the forecasts has a significant effect on economic benefits. In an effort to increase the accuracy of snowrnelt runoff forecasts, selected practices in water supply forecasting were evaluated. These practices include 1) using multiple regression in developing forecasting models;2) using a model that was calibrated to make forecasts an April 1 for making forecasts at other times;3) using maximum snow water equivalent measurements in forecast equations; and 4) using weighted snow water equivalent measurements for making forecasts. The results of a case study indicate that forecasting accuracy is significantly affected by these practices. Goodness-of-fit statistics may not be indicative of the accuracy of forecasts when the prediction equations are used to make forecasts for dates other than that used in calibration. The use of maximum snow water equivalentmeasurements and weighted averages did not improve forecast accuracy.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 8
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Notes: : While the quality of rivers has received much attention, the degradation of small streams in upland areas of watersheds has only recently been recognized as a major problem. A major cause of the problem is increases in nonpoint source pollution that accompany urban expansion. A case study is used to examine the potential for storm water detention as a means of controlling water quality in streams of small watersheds. The storm water management basin, which is frequently used to control increases in discharge rates, can also be used to reduce the level of pollutants in inflow to receiving streams. Data collected on a 148-acre site in Maryland shows that a detention basin can trap as much as 98 percent of the pollutant in the inflow. For the 11 water quality parameters, most showed reductions of at least 60 percent, depending on storm characteristics.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 9
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Notes: : With the increased use of models in hydrologic design, there is an immediate need for a comprehensive comparison of hydrologic models, especially those intended for use at ungaged locations (i.e., where measured data are either not available or inadequate for model calibration). But some past comparisons of hydrologic models have used the same data base for both calibration and testing of the different models or implied that the results of model calibration are indicative of the accuracy at ungaged locations. This practice was examined using both the regression equation approach to peak discharge estimation and a unit hydrograph model that was intended for use in urban areas. The results suggested that the lack of data independence in the calibration and testing of regression equations may lead to both biased results and misleading statements about prediction accuracy. Additionally, although split-sample testing is recognized as desirable, the split-samples should be selected using a systematic-random sampling scheme, rather than random sampling, because random sampling with small samples may lead to a testing sample that is not representative of the population. A systematic-random sampling technique should lead to more valid conclusions about model reliability. For models like a unit hydrograph model, which are more complex and for which calibration is a more involved process, data independence is not as critical because the data fitting error variation is not as dominant as the error variation due to the calibration process and the inability of the model structure to conform with data variability.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 10
    Electronic Resource
    Electronic Resource
    Oxford, UK : Blackwell Publishing Ltd
    Journal of the American Water Resources Association 16 (1980), S. 0 
    ISSN: 1752-1688
    Source: Blackwell Publishing Journal Backfiles 1879-2005
    Topics: Architecture, Civil Engineering, Surveying , Geography
    Notes: : Recent regulations require impact statements for major water development projects, including reservoirs that will be used for water supply, recreation, and pollution control. A water quantity/quality model was developed and used for making water quality projections of a proposed reservoir in Montgomery County, Maryland. The study area is uncommon in that there is an extensive water quality data base. The results indicate that land use changes will have a significant effect on water quality and that the proposed reservoir will improve the quality of the surface waters downstream from the reservoir. A major effect of land use changes is the increase in the variability of water quality.
    Type of Medium: Electronic Resource
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...