ISSN:
1089-7623
Source:
AIP Digital Archive
Topics:
Physics
,
Electrical Engineering, Measurement and Control Technology
Notes:
The construction program of AURORA, the compact synchrotron light source, was started in the fall of 1986, and is now at the final assembly stage. We have observed a good uniform field from the superconducting magnet. In this article the construction status of the superconducting electron storage ring, injection microtron, beam monitoring, and control system is briefly reported.
Type of Medium:
Electronic Resource
URL:
http://dx.doi.org/10.1063/1.1141089
Permalink