ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Publication Date: 2015-02-24
    Description: Yard truck scheduling and storage allocation problems (YTS-SAP) are two important issues that influence the efficiency of a container terminal. These two problems aim to determine the routing of trucks and proper storage locations for discharging containers from incoming vessels. This paper integrates YTS and SAP as a whole and tries to minimize the weighted summation of total delay and total yard trucks travel time. A genetic algorithm (GA) is proposed to deal with the problem. In the proposed GA, guidance mutation approach and exhaustive heuristic for local searching are used in order to force the GA to converge faster and be steadier. To test the performance of the proposed GA, both small scale and large scale cases are studied. The results of these cases are compared with CPLEX for the small scale cases. Since this problem is an NP-hard problem, which CPLEX cannot solve, a simple GA is studied for comparison in large scale cases. The comparison demonstrates that the proposed GA can obtain near optimal solutions in much shorter computational time for small scale cases. In addition, the proposed GA can obtain better results than other methods in reasonable time for large scale cases.
    Print ISSN: 1024-123X
    Electronic ISSN: 1563-5147
    Topics: Mathematics , Technology
    Published by Hindawi
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Publication Date: 2015-02-26
    Description: This paper investigates the economic production quantity model jointly considering product deterioration and a deteriorating production system with rework. In this imperfect deteriorating production system, not only does the machine produce defective product but also the machine is subjected to quality deterioration. To be more specific, the defective rate increases at certain time intervals. The defects produced are stored until the end of normal production process. Then they are reworked with extra cost to restore their quality and regarded as perfect product. The main objective is to minimize the total cost per unit product by determining the optimal combination of production run time and backlog quantity. Numerical experiments are carried out to illustrate the behavior of the inventory and show the impact of different parameters on the model. Discussion and conclusions are made at the end of the paper.
    Print ISSN: 1024-123X
    Electronic ISSN: 1563-5147
    Topics: Mathematics , Technology
    Published by Hindawi
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...