ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

feed icon rss

Ihre E-Mail wurde erfolgreich gesendet. Bitte prüfen Sie Ihren Maileingang.

Leider ist ein Fehler beim E-Mail-Versand aufgetreten. Bitte versuchen Sie es erneut.

Vorgang fortführen?

Exportieren
  • 1
    Digitale Medien
    Digitale Medien
    Bradford : Emerald
    Logistics information management 8 (1995), S. 42-48 
    ISSN: 0957-6053
    Quelle: Emerald Fulltext Archive Database 1994-2005
    Thema: Wirtschaftswissenschaften
    Notizen: Work undertaken in collaboration with BPICS, Cincom (UK) Ltd andICI Engineering supported by funding from the EPSRC (CDP). The projectreviewed planning and scheduling procedures in over 30 industrialcompanies over a two-year period to establish best practice inshop-floor scheduling and to identify the key factors for schedulingsuccess. Outlines the research approach briefly to provide a frameworkfor the analysis of scheduling performance by industrial sector and byscheduling tool. This includes a powerful method for the performancemeasurement of supply-chain management systems which allows thecomparison of effectiveness in different operating environments and whenusing a variety of scheduling approaches. Important elements of theproject were the review and comparison of scheduling performance inconventional MRPII environments (usually a manual activity based onexpediting or the use of shop floor control) with that of more recentfinite capacity-based tools and a classification of schedulingapproaches. Some clear lessons have been learned. Concludes bypresenting these along with an outline of the success factors whichunderpin effective scheduling performance in the range of best practicecompanies identified.
    Materialart: Digitale Medien
    Standort Signatur Erwartet Verfügbarkeit
    BibTip Andere fanden auch interessant ...
  • 2
    Digitale Medien
    Digitale Medien
    Bradford : Emerald
    Integrated manufacturing systems 6 (1995), S. 22-26 
    ISSN: 0957-6061
    Quelle: Emerald Fulltext Archive Database 1994-2005
    Thema: Maschinenbau , Wirtschaftswissenschaften
    Notizen: Discusses the relationships between finite schedulers which operateon output from a higher level in a conventional MRPII system, andso-called stand-alone schedulers which essentially operate directly onorders. Presents two graphical models - a demand flow model and aflowpipe model - which help to explain the differences betweensuch schedulers and are used to illustrate the key features of each.Coupled schedulers tend to work on demand which has already beensmoothed or planned in some way and can be described as planning-led,whereas stand-alone schedulers work from unfiltered data, with theoperator reacting to schedule quality (due-date performance, resourceactivation levels, etc.) and thence adjusting resource and rerunning.Ascribes the growth of the stand-alone scheduler, at least in part, tothe greatly increased computing power available quite inexpensively onmodern equipment.
    Materialart: Digitale Medien
    Standort Signatur Erwartet Verfügbarkeit
    BibTip Andere fanden auch interessant ...
Schließen ⊗
Diese Webseite nutzt Cookies und das Analyse-Tool Matomo. Weitere Informationen finden Sie hier...