ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    Publication Date: 2024-04-11
    Description: Modern production systems have become more flexible and agile. For them, a suitable control and planning method is needed. Agent-based systems offer the required characteristics. The contributions of these work are a remodeling of the Shifting Bottleneck heuristic to include limited buffers, the development of a decentralized multi-agent system for production planning, and the adaptation of the heuristic to the agent system. It concludes with evaluations of real-world production systems.
    Keywords: Produktionsplanung; Dezentral; Limitierte Puffer; Ablaufplanung; Multi-Agenten-System; Production Planning; Decentral; Limited Buffer; Scheduling; Multi-Agent System ; thema EDItEUR::T Technology, Engineering, Agriculture, Industrial processes::TG Mechanical engineering and materials
    Language: English
    Format: image/jpeg
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...