ALBERT

All Library Books, journals and Electronic Records Telegrafenberg

Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
Filter
  • Journals
  • Other Sources  (4,887)
  • GEOPHYSICS  (3,304)
  • COMMUNICATIONS AND RADAR  (1,583)
  • 1990-1994  (4,876)
  • 1955-1959  (11)
Collection
  • Journals
  • Other Sources  (4,887)
Source
Years
Year
  • 1
    Publication Date: 2004-12-03
    Description: The thinning and intensification of the cross tail current sheet during the substorm growth phase are analyzed during the CDAW 6 substorm (22 Mar. 1979) using two complementary methods. The magnetic field and current sheet development are determined using data from two spacecraft and a global magnetic field model with several free parameters. These results are compared with the local calculation of the current sheet location and structure previously done by McPherron et al. Both methods lead to the conclusion that an extremely thin current sheet existed prior to the substorm onset, and the thicknesses estimated by the two methods at substorm onset agree relatively well. The plasma data from the ISEE 1 spacecraft at 13 R(sub E) show an anisotropy in the low energy electrons during the growth phase which disappears just before the substorm onset. The global magnetic model results suggest that the field is sufficiently stretched to scatter such low energy electrons. The strong stretching may improve the conditions for the growth of the ion tearing instability in the near Earth tail at substorm onset.
    Keywords: GEOPHYSICS
    Type: ESA, Substorms 1; p 131-135
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 2
    Publication Date: 2004-12-03
    Description: An approach to the study of the solar wind-magnetosphere interaction by signal type, that is, by examining the effect in the magnetosphere of well defined interplanetary structures, is presented. Focus is on the response of the magnetosphere to interplanetary magnetic clouds. Among their properties are: the slow and smooth variation of the magnetic field vector, with fluctuation level well below common interplanetary values; the similarly well behaved bulk flow; the wide range of field and flow parameters; and the longevity of passage (1 to 2 days). If the magnetic cloud is oriented such that a long period of uninterruptedly northward pointing field is followed by a long interval of continuously southward pointing field, then the transition of the magnetosphere from a quiescent state (the 'ground state') to a very active state can be studied, the latter being sustained by continued forcing from the magnetic cloud. A synopsis of the main findings of a recent study in such an interaction is given, concentrating on the substorm activity attending the second part of cloud passage.
    Keywords: GEOPHYSICS
    Type: ESA, Substorms 1; p 371-376
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 3
    Publication Date: 2004-12-03
    Description: There is a frequent need to measure the frequency stability and phase noise levels of very high performance signal sources that are required for certain spacecraft missions. These measurements need to be done at different locations as the spacecraft subsystems progress through the various stages of development, assembly, test, and integration. Allan Deviation and Phase Noise of high performance sources are generally measured by comparing the unit under test to a reference standard. Five basic requirements are associated with making these kind of measurements: (1) the reference standard performance needs to be equal or better than the unit under test; (2) the measurement system needs to accommodate odd, nonstandard measurement frequencies that can range from 4 MHz to 35 GHz; (3) warm-up frequency drift and aging can corrupt a measurement and must be dealt with; (4) test equipment generated noise must be understood and prevented from limiting the measurements; (5) test equipment noise performance must be verifiable in the field as needed. A portable measurement system that was built by JPL and used in the field is described. The methods of addressing the above requirements are outlined and some measurement noise floor values are given. This test set was recently used to measure state of the art crystal oscillator frequency standards on the TOPEX and MARS OBSERVER spacecraft during several stages of acceptance tests.
    Keywords: COMMUNICATIONS AND RADAR
    Type: NASA. Goddard Space Flight Center, The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting; p 427-438
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 4
    Publication Date: 2004-12-03
    Description: A study was conducted to assess the effects of transmitting a precision clock synchronization signal over a commercial multiplexed fiber optic communication system. This study is an evaluation of the distortion and jitter introduced into the signal by this type of transmission system. An analysis comparing signal quality at the multiplexing and demultiplexing ends of the fiber optic communication system shows that the amplitude and phase distortion added to the clock synchronization signal by the transmission system is minimal.
    Keywords: COMMUNICATIONS AND RADAR
    Type: NASA. Goddard Space Flight Center, The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting; p 375-384
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 5
    Publication Date: 2004-12-03
    Description: Historically, Maximum Time Interval Error (MTIE) and Maximum Relative Time Interval Error (MRTIE) have been the main measurement techniques used to characterize timing performance in telecommunications networks. Recently, a new measurement technique, Time Variance (TVAR) has gained acceptance in the North American (ANSI) standards body. TVAR was developed in concurrence with NIST to address certain inadequacies in the MTIE approach. The advantages and disadvantages of each of these approaches are described. Real measurement examples are presented to illustrate the critical issues in actual telecommunication applications. Finally, a new MTIE measurement is proposed (ZTIE) that complements TVAR. Together, TVAR and ZTIE provide a very good characterization of network timing.
    Keywords: COMMUNICATIONS AND RADAR
    Type: NASA. Goddard Space Flight Center, The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting; p 313-326
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 6
    Publication Date: 2004-12-03
    Description: For proper operation of today's large digital private networks, high quality synchronization must be achieved. A general telecommunication performance objective is to maintain long-term frequency accuracy of ten parts per trillion at all synchronous digital equipment in the network. Many times, however, this is not achieved in private networks. Low quality clocks, errored transmission facilities, and incorrectly designed synchronization plans are often cause for poor performance. It is shown that properly-designed private networks can operate with long term frequency averages between ten parts per trillion to ten parts per million. These performance levels can adversely impact customer applications. The most demanding applications are digital and voice band data, encrypted voice, facsimile, and video. In a typical private network operating at 0.01 parts per million, the user would experience reduced data throughput, dropped encrypted calls, unreadable facsimile pages, or interrupted video transmission dozens of times per day. The major contribution to poor private network synchronization performance is the interaction of Customer Premises Equipment (CPE) clocks and the network facilities used to distribute timing. The performance of typical CPE clocks and facilities, and their impact on customer applications, are discussed. CPE clock performance issues, along with private network architectural constraints, make synchronization planning extremely difficult. Planning is usually costly and requires specialized expertise.
    Keywords: COMMUNICATIONS AND RADAR
    Type: NASA. Goddard Space Flight Center, The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting; p 327-336
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 7
    Publication Date: 2004-12-03
    Description: A new method that uses round-trip paths to accurately measure transmission delay for time synchronization is proposed. The performance of the method in Synchronous Digital Hierarchy networks is discussed. The feature of this method is that it separately measures the initial round trip path delay and the variations in round-trip path delay. The delay generated in SDH equipment is determined by measuring the initial round-trip path delay. In an experiment with actual SDH equipment, the error of initial delay measurement was suppressed to 30ns.
    Keywords: COMMUNICATIONS AND RADAR
    Type: NASA. Goddard Space Flight Center, The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting; p 303-312
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 8
    Publication Date: 2004-12-03
    Description: A coded time/date information dissemination system (CTD), based on telephone lines and commercial modems, is now in its experimental phase in Italy at IEN. This service, born from a cooperation with other metrological laboratories (TUG, Austria, SNT, Sweden, VSL, The Netherlands), represents an attempt towards an European standardization. Some results of an experimental analysis in which a few modems were tested, both in laboratory conditions and connected to the telephone network, in order to evaluate the timing capability of the system are given. When the system is used in a one-way mode, in many practical cases the modems delay turns out to be the main factor which limits the accuracy, even more than the telephone line delays. If the two-way mode is used, the modems asymmetry, i.e., the delay difference between transmission and reception, is almost always the most important source of uncertainty, provided the link is not including a space segment. Comparing the widely used V.22 modems to the old V.21 ones, the latters turn out to be better both in delay time (30-100 ms V.22, and 7-15 ms V.21) and asymmetry (10-50 micro-s V.22, and 10 ms V.22). Time transfer accuracies of 10 micron-s (same turn) to 100 micro-s (long distance calls) were obtained in two-way mode with commercial V.21 modems.
    Keywords: COMMUNICATIONS AND RADAR
    Type: NASA. Goddard Space Flight Center, The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting; p 243-254
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 9
    facet.materialart.
    Unknown
    In:  CASI
    Publication Date: 2004-12-03
    Description: The stability of the geomagnetic tail is investigated on the basis of three dimensional resistive magnetohydrodynamic simulations, using different dynamic constraints and different initial equilibria. Different forms of the energy equation for isotropic pressure are found to have no significant effect on the dynamic growth of a resistive tearing instability, which is responsible for near Earth reconnection, plasmoid formation and ejection, and the generation of fast plasma flows. The constraints of a modified double adiabatic approach, however, can quench the tearing instability through the development of large, mirror type, anisotropies in the boundary regions of the plasma sheet, unless isotropization occurs on fast, nearly Alfvenic, time scales. The presence of a net cross tail magnetic field component B(sub yN) can reduce the growth of the instability without complete stabilization. An increase of B(sub z) from midnight toward the tail flanks, however, by more than a factor of about 3, apparently completely stabilizes the tearing mode. Stabilization and destabilization thus may depend on properties and constraints (and their release) in regions other than the neutral sheet where reconnection is initiated.
    Keywords: GEOPHYSICS
    Type: ESA, Substorms 1; p 225-230
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
  • 10
    Publication Date: 2004-12-03
    Description: Issues concerning the 'driven' versus 'unloading' nature of substorms are presented. The original concepts attendant to this debate are presented and substorms are concluded to inextricably combine aspects that are driven with aspects that represent a loading-unloading system. For isolated substorms, the magnetosphere-ionosphere system is shown to exhibit a bimodal response to solar wind changes. A 20 min response characteristic is associated with the driven aspect of substorms, while a 1 hr response time is associated with unloading. It is found that for strong solar wind input conditions, the magnetospheric response becomes more nearly unimodal. This is interpreted in terms of a nonlinear dynamical evolution of the system. Simple analog models are described which capture the essence of the nonlinear magnetospheric behavior. These models exhibit chaotic transitions for strong driving conditions: this may explain the observed behavior of the magnetosphere during strong geomagnetic activity.
    Keywords: GEOPHYSICS
    Type: ESA, Substorms 1; p 185-191
    Format: text
    Location Call Number Expected Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. More information can be found here...